18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

290<br />

Enhancement/Mitigation<br />

Measures Entities<br />

18b. Replace all of the water<br />

system infrastructure and access<br />

roads at the French Meadows South<br />

water system within 5 years<br />

19a. Remove the Upper Hell Hole<br />

Campground within 2 years<br />

19b. Remove the Upper Hell Hole<br />

Campground within 7 years<br />

20. Develop, install, and maintain<br />

trailhead markers at the start of the<br />

Upper Hell Hole, Poppy Trailhead<br />

(for Western States Trail) and along<br />

Western States Trail in the vicinity<br />

of French Meadows dam within 1<br />

year<br />

21. Reconstruct and maintain the<br />

Hell Hole Reservoir Trail (Forest<br />

Service Trail 14E02) for pedestrian<br />

use within 14 years<br />

Capital Cost<br />

(2012$) a<br />

Annual Cost<br />

(2012$) a<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$78,680 $0 $6,300 d<br />

PCWA $22,640 $0 $1,810 c<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$36,480 $0 $2,920 d<br />

PCWA $0 $0 $0 g<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$314,740 $0 $25,210 d

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!