20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

identified project-related issue or need, and the site would serve non-project purposes, it<br />

would not be appropriate to include the Hell Hole administrative site, or any funding for<br />

the facility, in the project.<br />

Whitewater Boating<br />

PCWA proposes the release schedule in table 3.3.5-10 to provide flows<br />

downstream of Oxbow powerhouse for whitewater boating.<br />

Table 3.3.5-10. PCWA’s proposed flow schedule to support class IV boating<br />

opportunities on the peaking reach downstream of Oxbow powerhouse<br />

(Source: PCWA, 2011a).<br />

Water year<br />

type<br />

Wet/above<br />

normal<br />

Below<br />

normal<br />

Flow a<br />

(cfs)<br />

Duration<br />

(Time of day)<br />

800 b 3 hours c<br />

(5 a.m.–8 a.m.)<br />

1,000 4 hours<br />

(8 a.m.–noon)<br />

900 4 hours<br />

(8 a.m.–noon)<br />

Dry 900 4 hours<br />

(8 a.m.–noon)<br />

Critical 900 3 hours<br />

(9 a.m.–noon)<br />

Weekdays Weekends<br />

June 1–<br />

Labor Day<br />

237<br />

1 st Saturday<br />

before<br />

Memorial<br />

Day–Labor<br />

Day<br />

Labor Day–<br />

September<br />

-- Saturdays --<br />

5 days per<br />

week<br />

4 days per<br />

week<br />

3 days per<br />

week<br />

2 days per<br />

week<br />

Saturdays,<br />

Sundays<br />

Saturdays,<br />

Sundays<br />

Saturdays,<br />

Sundays<br />

Saturdays,<br />

Sundays<br />

Saturdays<br />

Saturdays<br />

Saturdays<br />

Saturdays<br />

Extremely 900 3 hours 1 days per Saturdays --<br />

critical<br />

(9 a.m.–noon) week<br />

a<br />

As measured below the confluence of <strong>Middle</strong> and North <strong>Fork</strong>s of the <strong>American</strong> <strong>River</strong><br />

unless otherwise specified (USGS gage no. 11433300).<br />

b<br />

Target flow at North <strong>Fork</strong> of the <strong>American</strong> <strong>River</strong> above <strong>American</strong> <strong>River</strong> pump station<br />

gage.<br />

c<br />

Early release to provide flow downstream sooner in the day.<br />

Forest Service condition no. 39 is more detailed than PCWA’s proposal and<br />

includes generally higher flows. Table 3.3.5-11 shows the flows specified for providing