18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

279<br />

Enhancement/Mitigation<br />

Measures Entities<br />

4. Develop a plan to identify<br />

release points when flow conduits<br />

need to be drained<br />

5. Develop and implement a<br />

woody debris management plan<br />

Aquatic Resources<br />

1a. Implement the proposed<br />

Instream Flow and Reservoir<br />

Minimum Pool measure<br />

1b. Implement the Alternative 1<br />

Instream Flow and Reservoir<br />

Minimum Pool Measure<br />

2a. Implement the Flow and<br />

Reservoir Monitoring Plan<br />

2b. Implement the Alternative 1<br />

Streamflow and Reservoir Gaging<br />

Plan<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

Capital Cost<br />

(2012$) a<br />

Annual Cost<br />

(2012$) a<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

$10,000 $0 $800 e<br />

$5,000 $1,000 $1,400 e<br />

PCWA $2,622,830 $1,745,210<br />

(includes<br />

$1,682,260 in lost<br />

generation [44,634<br />

MWh])<br />

Forest Service,<br />

California Fish and<br />

Game, Interior, staff<br />

(Alternative 1)<br />

$2,622,830 $2,068,100<br />

(includes<br />

$2,005,147 in lost<br />

generation [53,201<br />

MWh])<br />

$1,955,260 c<br />

$2,278,150 d<br />

PCWA $104,910 $125,900 $134,300 c<br />

Forest Service,<br />

California Fish and<br />

Game (Alternative 1)<br />

$157,310 $130,090 $142,690 d

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!