18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

307<br />

Resource No-Action Alternative Proposed Action<br />

Aquatic Recruitment to trout<br />

populations in peaking<br />

reach low<br />

Minimum flows relatively<br />

constant throughout the<br />

year, no provisions for<br />

planned pulse flows that<br />

would simulate<br />

unregulated streams or<br />

downramping that would<br />

avoid stranding<br />

Some enhancement of<br />

recruitment from gravel<br />

augmentation<br />

Minimum flows increased,<br />

with higher minimum flows<br />

during the spring trout<br />

spawning and incubation<br />

period; spring pulse flows<br />

would simulate natural high<br />

flows; protective<br />

downramping; would result<br />

in enhanced trout<br />

populations and aquatic<br />

habitat<br />

Staff–Recommended<br />

Alternative Alternative 1<br />

Same as proposed action<br />

but spawning habitat in<br />

the Ralston afterbay<br />

bypassed reach would be<br />

enhanced with gravel<br />

placement or other<br />

measures<br />

Similar to proposed action<br />

for bypassed reaches;<br />

generally higher<br />

minimum flows in the<br />

peaking reach would<br />

build on proposed project<br />

enhancements<br />

Same as proposed<br />

action<br />

Same as staff<br />

alternative

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!