18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

LIST OF TABLES<br />

Table 1. Major statutory and regulatory requirements for the <strong>Middle</strong> <strong>Fork</strong><br />

<strong>American</strong> <strong>River</strong> Hydroelectric <strong>Project</strong> .................................................... 4<br />

Table 3.3.1-1. Average number of days gravel motion is initiated by water year<br />

type ......................................................................................................... 41<br />

Table 3.3.1-2. Proposed and Alternative 1 (in parentheses when different from<br />

proposed) pulse flow schedule for wet and above normal<br />

water years ............................................................................................. 54<br />

Table 3.3.1-3. Proposed and Alternative 1 implementation schedule of pulse flows<br />

and flow measurement locations. Note: Year 1 begins 30 days after<br />

license issuance ...................................................................................... 56<br />

Table 3.3.2-1. Key characteristics of project impoundments related to water<br />

storage .................................................................................................... 64<br />

Table 3.3.2-2. Minimum pool requirements ................................................................. 65<br />

Table 3.3.2-3. Hydrology for selected sites (hydrology nodes) in waters associated<br />

with the <strong>Middle</strong> <strong>Fork</strong> <strong>Project</strong> ................................................................. 69<br />

Table 3.3.2-4. Minimum stream maintenance flow requirements ................................ 75<br />

Table 3.3.2-5. Hydrology for project powerhouses (hydrology nodes) at the <strong>Middle</strong><br />

<strong>Fork</strong> <strong>Project</strong> ............................................................................................ 78<br />

Table 3.3.2-6. Summary of project area water rights permits ....................................... 80<br />

Table 3.3.2-7. Water quality objectives to support designated beneficial uses in the<br />

project area ............................................................................................. 83<br />

Table 3.3.2-8. Minimum instream flows (cfs) by water year under the proposed<br />

action and Alternative 1 ....................................................................... 104<br />

Table 3.3.2-9. Proposed and Alternative 1 downramping rates proposed following<br />

spills from Hell Hole reservoir dam into Rubicon <strong>River</strong> and from<br />

French Meadows reservoir dam into <strong>Middle</strong> <strong>Fork</strong> <strong>American</strong> <strong>River</strong> ... 110<br />

Table 3.3.2-10. Proposed and Alternative 1 up- and downramping rates proposed<br />

for March through October at Oxbow powerhouse ............................. 111<br />

Table 3.3.3-1. Vegetation communities and wildlife habitats in the <strong>Middle</strong> <strong>Fork</strong><br />

<strong>Project</strong> vicinity ..................................................................................... 132<br />

xiii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!