18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Provide a comprehensive description of all existing and proposed<br />

improvements and amenities at each project facility (i.e., do not present<br />

separate discussions by type of development such as trails, or whether an<br />

improvement is a new facility);<br />

Present text that is consistent with all tabular information; and<br />

Contain all information needed for Commission staff to determine<br />

compliance with measures specified in the plan and not to refer to<br />

relicensing reports.<br />

• Implement the Transportation System Management Plan as modified by<br />

Alternative 1, with visual condition assessments every 6 years instead of every<br />

5 years to synchronize data collection and reporting with the FERC Form 80<br />

filing schedule.<br />

• Expand the project boundary as necessary to include areas proposed by PCWA<br />

and the entire length of Hell Hole trail between the dam and McKinstry trail<br />

(Forest Service trail no. 15E02).<br />

• Implement the Visual Resource Management Plan and conduct visual<br />

condition assessments every 6 years instead of every 5 years to synchronize<br />

data collection and reporting with the FERC Form 80 filing schedule.<br />

• Revise the Alternative 1 Historic Properties Management Plan to include:<br />

(1) requirements for National Register of Historic Places (National Register)<br />

evaluation of all currently unevaluated resources subject to unavoidable<br />

project-related effects. These effects would include those associated with<br />

reservoir drawdowns for operation and maintenance purposes (i.e., FS-05-03-<br />

55-684 and FS-05-03-55-689), recreation activities, including trail<br />

maintenance and alignment (PL-03 and PL-19), and road construction (FS-05-<br />

03-55-495), and documentation of California State Historic Preservation<br />

Officer (California SHPO) concurrence with all National Register<br />

recommendations; (2) a plan for assessment of project effects to any properties<br />

that are determined to be eligible for listing on the National Register; (3) a plan<br />

for the curation of any recovered archaeological materials; and (4) a plan to<br />

develop mitigation measures in consultation with the California SHPO, Forest<br />

Service, and participating tribes for all eligible properties where effects are<br />

adverse.<br />

No-action Alternative<br />

Under the no-action alternative, the project would continue to operate under the<br />

terms and conditions of the existing license, and no new environmental protection,<br />

mitigation, or enhancement measures would be implemented.<br />

xxv

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!