18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

293<br />

Enhancement/Mitigation<br />

Measures Entities<br />

28. Provide a potable water supply<br />

at the Hell Hole Boat Ramp within<br />

5 years<br />

29. Construct a trail to provide<br />

pedestrian access to the <strong>Middle</strong><br />

<strong>Fork</strong> of the <strong>American</strong> <strong>River</strong> below<br />

the <strong>Middle</strong> <strong>Fork</strong> Interbay Dam<br />

within 3 years<br />

30a. Reduce the size of the Ralston<br />

Picnic Area from 5 sites to 4 sites<br />

and install paths, traffic barriers,<br />

and signage within 2 years<br />

30b. Reduce the size of the Ralston<br />

Picnic Area from 5 sites to 3 sites<br />

and redesign and reconstruct within<br />

5 years<br />

31. Upgrade the existing trail from<br />

the Ralston afterbay picnic area to<br />

the stream gage within 5 years<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

Capital Cost<br />

(2012$) a<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Annual Cost<br />

(2012$) a<br />

$37,140 $0 $2,970 d<br />

$262,280 $0 $21,010 d<br />

PCWA $1,770 $0 $140 c<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$26,120 $0 $2,090 d<br />

$21,040 $0 $1,690 d

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!