18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

20120723-4002 FERC PDF (Unofficial) 07/23/2012<br />

Forest Service specifies consequences if these elevations are not achieved. Because<br />

neither PCWA nor the Forest Service have identified any issues associated with low<br />

reservoir levels during the summer, implementing this measure could require agency<br />

consultation and PCWA could be responsible for actions before a project-related effect<br />

has even been identified. Further, requiring PCWA-funded actions listed in the condition<br />

such as patrols and shoreline protection from motorized uses would not meet the intended<br />

purpose of the condition explained in the Forest Service rationale for the condition which<br />

is to support mid-summer reservoir-based recreation.<br />

Recreation Management Programs<br />

PCWA proposes to implement the following recreation management programs as<br />

part of its proposed Recreation Plan:<br />

• Monitor and report on recreation use every 6 years, which is consistent with<br />

FERC Form 80 reporting using site occupancy data, vehicle counts, and selfregistration<br />

data, as applicable. Provide use estimates.<br />

• Incorporate specific actions included in the Recreation Plan when<br />

implementing recreation measures to avoid and protect resources.<br />

• Disseminate real-time and most recent 14 days flow information for 10 gages<br />

via the internet (PCWA’s website or California Data Exchange Center).<br />

Include notification of reservoir spill and pulse flow events, a matrix showing<br />

travel time for pulse flows at key locations, and links to other pertinent<br />

websites.<br />

• Disseminate the most recent 6 months of weekly reservoir water surface<br />

elevation information at French Meadows and Hell Hole reservoirs via<br />

PCWA’s website. Include representative photographs of reservoirs at various<br />

water surface elevations and whether the boat ramps are functioning at their<br />

current elevations. This element would be discontinued if the boat ramps are<br />

extended.<br />

• Develop a brochure showing recreation facilities, roads, and trails available in<br />

the vicinity of the project, and provide the brochure (electronic and hard<br />

copies) to three Forest Service offices, Auburn and Georgetown Chambers of<br />

Commerce, and California Welcome Center in Auburn.<br />

• Stock fish in Hell Hole and French Meadows reservoirs equivalent to 50<br />

percent of California Fish and Game’s annual management target or 50 percent<br />

of the historical average (2001 to 2009). PCWA would either acquire and<br />

stock fish from private hatcheries or reimburse California Fish and Game for<br />

its proportionate share of the stocking cost. Annual consultation meetings<br />

would include discussions of stocking targets, species, fish acquisition, and<br />

previous year accomplishment reporting.<br />

230

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!