292<br />

Enhancement/Mitigation<br />

Measures Entities<br />

24b. Potentially convert to a group<br />

site or reduce the size of the Hell<br />

Hole Campground from 10 sites to<br />

7 sites within 9 years and provide a<br />

reliable and adequate potable water<br />

source and delivery system<br />

25a. Extend the Hell Hole Boat<br />

Ramp to elevation 4,485 feet, or as<br />

far as possible, within 1 year<br />

25b. Extend the Hell Hole Boat<br />

Ramp to elevation 4,485 feet within<br />

6 years, and then extend it to<br />

elevation 4,455 feet, or as far as<br />

possible, within 7 years<br />

26. Install barrier rock at Hell Hole<br />

lower boat ramp parking area<br />

within 1 year<br />

27. Restore areas removed from<br />

the Hell Hole boat ramp parking<br />

area when it was reduced in size,<br />

chip seal, and replace fencing<br />

within 7 years<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

Capital Cost<br />

(2012$) a<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Annual Cost<br />

(2012$) a<br />

$70,400 $0 $5,640 d<br />

PCWA $236,050 $2,360 $21,260 c<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$236,050 $2,360 $21,260 d<br />

PCWA $0 $0 $0 g<br />

Forest Service,<br />

California Fish and<br />

Game, staff<br />

(Alternative 1)<br />

$55,030 $0 $4,410d