18.08.2013 Views

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

Draft EIS_072312.pdf - Middle Fork American River Project ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

297<br />

Enhancement/Mitigation<br />

Measures Entities<br />

37. Modify the Hell Hole<br />

administrative facility to provide<br />

the space needed at this time for<br />

administrative workspace and<br />

storage along with providing a<br />

recreation rental to serve the<br />

visiting public that are looking for a<br />

recreation opportunity other than<br />

camping as specified in Forest<br />

Service preliminary 4(e) condition<br />

no. 36<br />

38a. Perform routine operation and<br />

maintenance as proposed<br />

38b. Perform routine operation and<br />

maintenance as recommended in<br />

Alternative 1<br />

38c. Perform routine operation and<br />

maintenance as recommended in<br />

Alternative 1 without providing law<br />

enforcement funding<br />

Forest Service,<br />

California Fish and<br />

Game<br />

Capital Cost<br />

(2012$) a<br />

Levelized<br />

Annual Cost<br />

(2012$) b<br />

Annual Cost<br />

(2012$) a<br />

$50,000 $1,000 $5,000 d<br />

PCWA $0 $78,680 $78,680 c<br />

Forest Service,<br />

California Fish and<br />

Game (Alternative 1)<br />

$0 $236,050 $236,050 d<br />

Staff $0 $225,560 $225,560 e<br />

39. Perform heavy maintenance. PCWA $0 $131,140 $131,140 c

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!