02.07.2014 Views

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

• The secondary road network around and across the R59 freew ay creates a<br />

lattice like netw ork that:<br />

o provides for continuous circular movement along/around the entire<br />

corridor;<br />

o will serve as the backbone to the future public transport network for the<br />

area as it links all precincts of economic activity to all residential<br />

precincts (maximises choice);<br />

o separates local traffic from regional traffic (even at the interchanges<br />

because local crossings are provided for); and<br />

o links to all railw ay stations.<br />

• Residential development and densification is proposed in close proximity to all<br />

railw ay stations in the area in order to enhance the potential ridership (and<br />

thus viability) of the commuter rail system.<br />

• Provision is made for both business park developments and individual<br />

business/industrial erven.<br />

• The residential areas earmarked along the R59 Corridor have sufficient<br />

capacity to provide for an additional 37 607 housing units w hich is more than<br />

enough to cater for the existing demand of about 4 936 units, as w ell as the<br />

projected incremental demand for Midvaal for at least the next 20 years. The<br />

existing housing count in the Midvaal area is about 10 800 units.<br />

7.2 R82 Corridor (Old Vereeniging-Jhb Road)<br />

The R82 is an important route that connects Vereeniging and Johannesburg. The<br />

road w as supplemented w ith the construction of the R59 freew ay running parallel to<br />

the R82. A Strategic Development Plan w as formulated for the R59 freew ay in 2004<br />

to promote the development of this route as a corridor. Development responded<br />

positively to this plan and is occurring rapidly along the R59, yet the prominence of<br />

this corridor has not detracted from the vitality of the R82. A Framew ork Plan w as<br />

therefore required for the R82 to ensure that development along the tw o routes is<br />

complimentary.<br />

7.2.1 Study Area<br />

The focus of the study area is the section of route R82 w hich falls w ithin the<br />

MidvaalLocal<strong>Municipality</strong>’s jurisdictional area. This road is also know n as the Main<br />

Vereeniging Road/Old Vereeniging Road or P1/1 and runs from north to south<br />

through the w est of the municipal area. The road follow s the alignment of the<br />

proposed K57 and w ill in future be upgraded to K-route standard (K57). A soft<br />

boundary approach w as follow ed in the demarcation of the study area, implying that<br />

the study area includes the properties fronting onto this road and other surrounding<br />

developments that impact on the road.<br />

The study area is located in predominantly rural area in the south of Gauteng. The<br />

follow ing settlements exist in the study area:<br />

• Tedderfield Agricultural Holdings;<br />

• Blignautsrus Agricultural Holdings;<br />

• Walkerville Manor Agricultural Holdings;<br />

• Golfview Agricultural Holdings;<br />

• Ohenimuri;<br />

• Homestead Apple Orchards Agricultural Holdings;<br />

SDM DITP, 2008 to 2013 101 31 Aug 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!