Chapter 11 - Sedibeng District Municipality
Chapter 11 - Sedibeng District Municipality
Chapter 11 - Sedibeng District Municipality
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5 STAKEHOLDER PARTICIPATION AND TRANSPORT NEEDS ASSESSM ENT<br />
This chapter contains a discussion of the stakeholder participation process follow ed<br />
whilst developing this DITPand a list of issues identified by stakeholders during the<br />
consultation sessions.<br />
5.1 Stakeholder Participation<br />
Structured consultation w ith stakeholdersthat w as follow ed to prepare this DITP for<br />
<strong>Sedibeng</strong> included the follow ing:<br />
• Project Steering Committee Meetings (various);<br />
• <strong>Sedibeng</strong> <strong>District</strong> Intergovernmental Workshops/Meetings (various);<br />
• Transport Workshop (October 2008). Stakeholders invited included national,<br />
provincial and local government representatives; taxi associations; bus<br />
operators; learner transport representatives/operators; metered taxi<br />
representatives; and commuter rail operators. The agenda covered the status<br />
of transport planning in Gauteng including in relation to road master planning,<br />
public transport, 2010 planning, passenger and freight rail planning;<br />
developing a vision and strategic approach for transport in Gauteng; and a<br />
description of the process to prepare the DITP for <strong>Sedibeng</strong>.<br />
• Taxi Workshops (various); and<br />
• Transport Summit (27 November 2009). The Transport Workshop (October<br />
2008) w as follow ed by a Transport Summit w here key decisions on transport<br />
planning and strategies w ere made.<br />
Key stakeholders invited to participate at the Transport Summit included:<br />
o <strong>Sedibeng</strong> Meter Taxi Council<br />
o Gauteng Commuter Organization<br />
o Ward Committees per Local<strong>Municipality</strong><br />
o Bus Companies<br />
o Top Six<br />
o SANCO<br />
o <strong>Sedibeng</strong> Taxi Council<br />
o Tourist Operators<br />
5.2 Transport Needs Assessment<br />
TABLE 5.1 contains a list of issues with respect to transport in <strong>Sedibeng</strong> raised<br />
during consultation sessions with key role players. In addition to such consultation,<br />
the <strong>Sedibeng</strong> ITP Update for 2004 was also consulted with a view to identifying local<br />
transport problems and issues still applicable in <strong>Sedibeng</strong>.<br />
SDM DITP, 2008 to 2013 59 31 Aug 2010