02.07.2014 Views

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Distinction w ill be made betw een:<br />

• system performance (e.g. travel time, travel cost, access times, etc); and<br />

• administrative performance (e.g. response times to repair system breakdow ns<br />

such as traffic signals, road potholes and traffic accidents).<br />

As mentioned earlier, early in 2002 the Gauteng Transport Coordinating Committee<br />

(TCC) approved "Specifications for the Measurement of Key Performance Indicators<br />

in Gauteng". This guideline document outlines a process to collect data and measure<br />

KPIs consisting of five phases:<br />

1. Determination of analysis areas<br />

2. Collection of demographic data for the analysis areas<br />

3. Determination of performance indicators<br />

4. Data collection<br />

5. Documentation and electronic transfer of data to the PTIS<br />

The above is applicable also to <strong>Sedibeng</strong>.<br />

According to the Municipal Systems Act 32, 2000, the results of performance<br />

measures must be audited as part of the <strong>Municipality</strong>’s internal auditing process and<br />

be audited annually by the Auditor-General, and made know n to the public through<br />

the Annual Report.<br />

15.4 Outcomes<br />

SDM w ill collect data and measure identified KPIs as required by GautengProvince.<br />

SDM DITP, 2008 to 2013 2<strong>11</strong> 31 Aug 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!