02.07.2014 Views

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

potential of the areas around the proposed nodes and corridors have how ever not yet<br />

been fully explored. Hence, to ensure that future developments are concentrated in a<br />

manner that w ould provide the maximum impetus for growth and development w ithin<br />

the <strong>Municipality</strong>, the feasibility of the nodes and corridors being proposed by the SDF<br />

have to be assessed holistically.<br />

Essentially then, given the strategic importance of nodal and corridor development to<br />

the socio-economic and environmental w ell-being of the <strong>Municipality</strong>, this study<br />

attempts to start to “unpack” the development of nodes and corridors within the<br />

Lesedi Local <strong>Municipality</strong> in greater detail, and provide parameters to guide detailed<br />

planning and development programmes in the area.<br />

The study area comprises the entire area of jurisdiction of the<br />

LesediLocal<strong>Municipality</strong>, w ith all the identified types of nodes and corridors as<br />

contained in the SDF of the <strong>Municipality</strong>, namely:<br />

• The proposed N3 and N17 Primary Development Corridors;<br />

• The proposed R42, R23, R549, R103, R550 and Heidelberg/Ratanda Road<br />

Secondary Development Corridors;<br />

• The proposed R42 and R549 Touris m Development Corridors;<br />

• The Heidelberg CBD as Primary Node;<br />

• The Ratanda and Devon CBDs as Secondary Nodes;<br />

• The proposed transportation related nodes at the junctions of the R23/N3, the<br />

R42/N3 and the R102/N3, the R42/N17, and the R550/N17;<br />

• The rural nodes proposed at the Vischkuil, Kaydale and Spaarw ater<br />

Agricultural Holdings;<br />

• The proposed Touris m Node along the R42; and<br />

• JamesonPark and Shalimar Ridge as Tertiary Nodes.<br />

7.3.2 Major Road Netw ork<br />

The N3 and N17 freew ays constitute the two primary transportation corridors<br />

traversing the study area and representing long distance linkages betw een<br />

GautengProvince and Mpumalanga, and GautengProvince and Kw aZulu-Natal<br />

respectively. Notably, given the prominence of these two roads within the regional<br />

and local space-economy, the SDF has identified them as primary development<br />

corridors along w hich to stimulate mixed-use developments (see FIGURE 7.3). None<br />

of these two routes however represent high volumes of commuter movement on a<br />

daily basis as occurs along the N1 freeway betw een the City of Tshwane and City of<br />

Johannesburg, or along route R21 betw een the City of Tshw ane and the Ekurhuleni<br />

Metro.<br />

SDM DITP, 2008 to 2013 106 31 Aug 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!