ROADS & STORMWATER FLAGSHIP PROJECTS (R60 million)<br />

Tariff<br />

(R)<br />

Suburb Street From To Width Length Area(m²)<br />

Cost<br />

(R)<br />

Cumulative<br />

(R)<br />

Ev aton<br />

West 8054 Erf 8370 Erf 8384 5.5 900 4950 550 2,722,500.00 51,671,565.00<br />

Ev aton<br />

West 4380 Erf 4969 Erf 4986 5.5 600 3300 550 1,815,000.00 53,486,565.00<br />

Ev aton<br />

West 47<strong>11</strong> Erf 4690 Erf 4735 5.5 640 3520 550 1,936,000.00 55,422,565.00<br />

Ironsy de Springbok rd Ev aton rd Werpner rd 6.2 592 3671 550 2,019,050.00 57,441,615.00<br />

Eatonside Cinderella Eric Knox 5.5 416 2288 550 1,258,400.00 58,700,015.00<br />

Tshepiso K55 3 150 450 8.9 300,000.00 59,000,015.00<br />

Sharpev ille<br />

Road SV99 (Memorial<br />

Ext ) Seeiso Mareka 6 285 1710 550 940,500.00 59,940,515.00<br />

Total Lentgh 14<strong>11</strong>8 59,940,515.00<br />

SDM DITP, 2008 to 2013 182 31 Aug 2010