02.07.2014 Views

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

Chapter 11 - Sedibeng District Municipality

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6.2 Land Use Development Trends<br />

The intention in the <strong>Sedibeng</strong> <strong>District</strong> is to consolidate the existing urban structure<br />

which is located parallel to the east of the N1 freew ay around the Evaton-Sebokeng<br />

complex, and up to the CBDs of Vanderbijlpark and Vereeniging in the southern<br />

parts. All the larger, vacant pockets of land w ithin this functional area have been<br />

identified for residential densification and infill developments. Along the R59 corridor<br />

which is located to the east of the N1 and the associated major residential areas,<br />

extensive economic development is expected in the next few decades. Several<br />

strategic development areas w ere identified along the R59 freew ay that could<br />

accommodate part of the increased need for residential development in this area.In<br />

the far eastern parts of the <strong>Sedibeng</strong> <strong>District</strong> w ithin the Lesedi Municipal Area the<br />

major features comprise the planned infill developments betw een Ratanda and<br />

HeidelbergTow n, as well as the formalisation of informal settlements around Vischkuil<br />

and Devon, both of w hich are located to the north along the N17 freew ay.<br />

6.2.1 Emfuleni<br />

Major development patterns in Emfuleni w ere ascertained during the compilation of<br />

the Emfuleni Civil Engineering Services Master Planning Report in April 2009. Tw o<br />

future scenarios were identified in consultation w ith the Emfuleni Development and<br />

Planning Cluster, other Government Departments (such as DoH and DPLG) and<br />

private sector role players:<br />

• Tow nship developments and/or densification projects w here applications have<br />

been received or pending, w ith these projects expected to commence w ith the<br />

0 to 5 year horison (w ith market conditions prevailing).<br />

• Tow nship developments and/or densification projects w here applications are<br />

not finalised, w ith these projects expected to commence only w ith the 5 to 10<br />

year horizon.<br />

0 – 5 year residential developments identified include:<br />

Name<br />

# Residential Units<br />

• ArconPark x10 100<br />

• ArconPark x<strong>11</strong> 1 200<br />

• Bedworthpark extensions 2 500<br />

• Bedworthpark x07 422<br />

• Beverley Hills 1 000<br />

• Bonanné x02 296<br />

• Bophelong x19 (old Chris Hani 1 squatter camp) 97<br />

• Bophelong x24 88<br />

• Chris Hani x01 4 900<br />

• Dadaville / Vlakfontein extensions 4 000<br />

• Duncanville 200<br />

• Eagles Nest 1 150<br />

• Evaton x02 50<br />

• FloraGardens x01 62<br />

• Golden Gardens 2 500<br />

• GoosebayCanyon (Vaaloewer) 52<br />

• Houtkop Densification 3 000<br />

• Johandeo extensions 5 500<br />

• Lethabong Proper (Quaggasfontein) 267<br />

SDM DITP, 2008 to 2013 66 31 Aug 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!