Chapter 11 - Sedibeng District Municipality
Chapter 11 - Sedibeng District Municipality
Chapter 11 - Sedibeng District Municipality
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
6.2 Land Use Development Trends<br />
The intention in the <strong>Sedibeng</strong> <strong>District</strong> is to consolidate the existing urban structure<br />
which is located parallel to the east of the N1 freew ay around the Evaton-Sebokeng<br />
complex, and up to the CBDs of Vanderbijlpark and Vereeniging in the southern<br />
parts. All the larger, vacant pockets of land w ithin this functional area have been<br />
identified for residential densification and infill developments. Along the R59 corridor<br />
which is located to the east of the N1 and the associated major residential areas,<br />
extensive economic development is expected in the next few decades. Several<br />
strategic development areas w ere identified along the R59 freew ay that could<br />
accommodate part of the increased need for residential development in this area.In<br />
the far eastern parts of the <strong>Sedibeng</strong> <strong>District</strong> w ithin the Lesedi Municipal Area the<br />
major features comprise the planned infill developments betw een Ratanda and<br />
HeidelbergTow n, as well as the formalisation of informal settlements around Vischkuil<br />
and Devon, both of w hich are located to the north along the N17 freew ay.<br />
6.2.1 Emfuleni<br />
Major development patterns in Emfuleni w ere ascertained during the compilation of<br />
the Emfuleni Civil Engineering Services Master Planning Report in April 2009. Tw o<br />
future scenarios were identified in consultation w ith the Emfuleni Development and<br />
Planning Cluster, other Government Departments (such as DoH and DPLG) and<br />
private sector role players:<br />
• Tow nship developments and/or densification projects w here applications have<br />
been received or pending, w ith these projects expected to commence w ith the<br />
0 to 5 year horison (w ith market conditions prevailing).<br />
• Tow nship developments and/or densification projects w here applications are<br />
not finalised, w ith these projects expected to commence only w ith the 5 to 10<br />
year horizon.<br />
0 – 5 year residential developments identified include:<br />
Name<br />
# Residential Units<br />
• ArconPark x10 100<br />
• ArconPark x<strong>11</strong> 1 200<br />
• Bedworthpark extensions 2 500<br />
• Bedworthpark x07 422<br />
• Beverley Hills 1 000<br />
• Bonanné x02 296<br />
• Bophelong x19 (old Chris Hani 1 squatter camp) 97<br />
• Bophelong x24 88<br />
• Chris Hani x01 4 900<br />
• Dadaville / Vlakfontein extensions 4 000<br />
• Duncanville 200<br />
• Eagles Nest 1 150<br />
• Evaton x02 50<br />
• FloraGardens x01 62<br />
• Golden Gardens 2 500<br />
• GoosebayCanyon (Vaaloewer) 52<br />
• Houtkop Densification 3 000<br />
• Johandeo extensions 5 500<br />
• Lethabong Proper (Quaggasfontein) 267<br />
SDM DITP, 2008 to 2013 66 31 Aug 2010