g) Prepare an impact assessment report summarizing <strong>and</strong> quantifying the above impacts using a combination<br />

text <strong>and</strong> graphic <strong>for</strong>mat (full size continuous plan sheets employing multi-color display of impact types<br />

superimposed over screened clean Base Plan), <strong>and</strong> including cross sections, proposed <strong>and</strong> Legal Grades, <strong>and</strong><br />

other details as needed to clarify <strong>design</strong> impacts/issues/concerns that have been identified.<br />

h) Identify any requirement to per<strong>for</strong>m an Environmental Assessment in accordance with applicable New York<br />

City <strong>and</strong> or New York State Environmental laws <strong>and</strong> regulations (CEQR, SEQRA) that may result from the<br />

proposed <strong>design</strong>.<br />

i) Make every reasonable ef<strong>for</strong>t to mitigate all negative impacts, <strong>and</strong> make recommendations to the<br />

Commissioner on the selection of a specific schematic geometric <strong>design</strong> alternative.<br />

j) Submit hard copy of the Schematic Geometric Design alternatives <strong>for</strong> review <strong>and</strong> present the alternative<br />

schemes to the Commissioner, including the impact assessment <strong>for</strong> each abutting property.<br />

k) Present the schematic geometric <strong>design</strong>, selected by the Commissioner, to the Bureau of Traffic <strong>for</strong> review<br />

<strong>and</strong> approval, <strong>and</strong> incorporate review comments received from the Bureau of Traffic as directed by the<br />

Commissioner. Submit the approved schematic geometric plans to the office of School Safety Program,<br />

incorporate their comments as directed by The Commissioner; <strong>and</strong> obtain their concurrence.<br />

l) Submit the schematic geometric <strong>design</strong>, selected by the Commissioner, to the private utility companies that<br />

own <strong>and</strong> operate facilities within the project <strong>and</strong> request their preliminary assessment of the impact that the<br />

proposed schematic geometric <strong>design</strong> will have on their utilities <strong>and</strong> the measures that they proposed to mitigate<br />

the identified impacts.<br />

m) Upon acceptance of the final Schematic Geometric Design <strong>and</strong> mitigation package by the Commissioner <strong>and</strong><br />

upon receipt of written notice to proceed from the Commissioner, the Consultant shall present jointly with the<br />

Commissioner, the recommended schematic geometric <strong>design</strong> <strong>and</strong> impact mitigation proposals to the affected<br />

Community Planning Board(s) at a <strong>for</strong>mal public meeting/hearing. The presentation shall include display boards<br />

<strong>and</strong> or projections that are sufficiently detailed to clarify the work <strong>and</strong> <strong>design</strong> proposals.<br />

n) Modify the Schematic Design <strong>and</strong> impact mitigation proposals, based on comments received from the<br />

Community Board <strong>and</strong> private utility companies as directed by the Commissioner.<br />

o) Upon receipt of written notice to proceed from the Commissioner, commence other work in conjunction with<br />

the Final Design program.<br />

4.11 ACQUISITION STUDY AND MAPPING<br />

A. Under this task the Consultant shall provide <strong>for</strong> the preparation of an Acquisition Study <strong>and</strong> <strong>for</strong> the preparation of<br />

Acquisition <strong>and</strong> Damage Maps in connection with the acquisition of property, to be per<strong>for</strong>med in conjunction with the<br />

Project.<br />

B. The scope of work <strong>for</strong> the Acquisition Study shall include review of all <strong>design</strong> recommendations indicated in the<br />

modified Preliminary Design Report; collection of all pertinent tax payment <strong>and</strong> ownership data; (identification of properties<br />

that must be acquired by the City), investigation of the possibility of acquiring properties through Corporation Counsel<br />

Opinions (CCOs), obviating the need <strong>for</strong> <strong>for</strong>mal acquisition procedures; preparation of an Acquisition Study Report;<br />

obtaining CCOs, where practicable; <strong>and</strong> attending all conferences, meetings <strong>and</strong> hearings, as required, to provide<br />

necessary <strong>engineering</strong> expertise to secure approvals.<br />

C. The scope of work <strong>for</strong> Mapping shall include obtaining additional topographic survey data, <strong>and</strong> preparation of<br />

Acquisition <strong>and</strong> Damage Maps. No work shall begin on the preparation of Acquisition <strong>and</strong> Damage Maps pending approval<br />

<strong>and</strong> written authorization from the Commissioner.<br />

D. ACQUISITION STUDY<br />

1. The Acquisition Study shall analyze the problems involved in the acquisition of properties. It shall ascertain which<br />

properties are required <strong>for</strong> the proper construction of a roadway <strong>and</strong> whether these properties can be acquired<br />

NYC Department of Design <strong>and</strong> Construction<br />

Infrastructure, October 2012<br />

GR-37