- Page 1 and 2: REQUEST FOR PROPOSALS PIN Project P
- Page 3 and 4: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 5 and 6: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 7 and 8: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 9 and 10: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 11 and 12: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 13 and 14: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 15 and 16: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 17 and 18: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 19 and 20: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 21 and 22: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 23 and 24: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 25 and 26: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 27 and 28: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 29 and 30: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 31 and 32: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 33 and 34: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 35 and 36: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 37 and 38: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 39 and 40: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 41 and 42: Tax ID # : PIN # : 8502013VP0008P-1
- Page 43 and 44: Tax ID #: PIN #: 8502013VP0008P-10P
- Page 45 and 46: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 47 and 48: PROJECT: HWDRMX02L, HWDRKR02L, HWDR
- Page 54 and 55: THIS AGREEMENT, made and entered in
- Page 56 and 57: Commissioner. ARTICLE 2 General Pro
- Page 58 and 59: Exhibit B as Key Personnel, unless
- Page 60 and 61: after receipt of payment by the Cit
- Page 62 and 63: of such direction. The Commissioner
- Page 64 and 65: Agreement shall not exceed the amou
- Page 66 and 67: 7.3.2 Maximum Price: In the event t
- Page 68 and 69: (2) Computation: The individual’s
- Page 70 and 71: of completion of all required servi
- Page 72 and 73: 7. Where a Subcontractor Utilizatio
- Page 74 and 75: (a) (b) (c) (d) (e) (f) (g) (h) (i)
- Page 76 and 77: ACKNOWLEDGMENT OF PRINCIPAL IF A CO
- Page 78 and 79: EXHIBIT B: SUB-CONSULTANTS AND KEY
- Page 80 and 81: Senior Mechanical Engineer Mechanic
- Page 82 and 83: Notes: (1) The minimum requirements
- Page 84 and 85: EXHIBIT E M/WBE SUBCONTRACTOR UTILI
- Page 86 and 87: CITY OF NEW YORK DEPARTMENT OF DESI
- Page 88 and 89: GENERAL REQUIREMENTS FOR DESIGN SER
- Page 90 and 91: (13) SEWER DATA SURVEY, AREA DRAINA
- Page 92 and 93: (l) All contract records material s
- Page 94 and 95: 1. OTHER AGENCIES AND JURISDICTIONS
- Page 96 and 97: narrative description of the work p
- Page 98 and 99: affect the project. The Consultant
- Page 100 and 101:
6. The Datum Plane shall be “as i
- Page 102 and 103:
structural columns, artwork (all ty
- Page 104 and 105:
e. Sufficient fixed witness points
- Page 106 and 107:
7. The Profile shall be plotted und
- Page 108 and 109:
Q. PRELIMINARY SUBMITTAL Four (4) s
- Page 110 and 111:
11. The Consultant shall prepare a
- Page 112 and 113:
E. The Consultant, complying with a
- Page 114 and 115:
g) Based on the judgment of the Con
- Page 116 and 117:
) The exploration program shall gen
- Page 118 and 119:
(i) Maintaining the vault space and
- Page 120 and 121:
Design Guide, as specified herein.
- Page 122 and 123:
g) Prepare an impact assessment rep
- Page 124 and 125:
9. Originals of plans and maps shal
- Page 126 and 127:
8. The Consultant shall prepare sum
- Page 128 and 129:
a) General description of all sewer
- Page 130 and 131:
c) Conduct a general review of the
- Page 132 and 133:
) In addition to the programmed Mas
- Page 134 and 135:
eviewed/coordinated with the Commis
- Page 136 and 137:
the Consultant, it is infeasible to
- Page 138 and 139:
NYC Department of Design and Constr
- Page 140 and 141:
NYC Department of Design and Constr
- Page 142 and 143:
(b) Study and Design of Street Drai
- Page 144 and 145:
. The Consultant shall make every t
- Page 146 and 147:
noted and reconciled, wherever poss
- Page 148 and 149:
3. During design, confer and meet w
- Page 150 and 151:
Documents as provided for in the St
- Page 152 and 153:
2. MPT, for the purposes of this co
- Page 154 and 155:
each question exactly as phrased by
- Page 156 and 157:
(iv) Shop Drawings Project ID. Cont
- Page 158 and 159:
6. The Consultant shall present its
- Page 160 and 161:
(iii) (iv) The Consultant shall per
- Page 162 and 163:
During the construction stages of t
- Page 164 and 165:
proposed project construction to sa
- Page 166 and 167:
i. The Consultant shall examine the
- Page 168 and 169:
D. Final Deliverables Upon completi
- Page 170 and 171:
(o) The Consultant shall study the
- Page 172 and 173:
(ii) (iii) Revising the location of
- Page 174 and 175:
4.40 FINAL DESIGN OF GREEN INFRASTR
- Page 176 and 177:
APPENDIX A-1: SUPPLEMENTAL TITLE VI
- Page 178 and 179:
(5) CERTIFICATION REQUIRED BY 40 CF
- Page 180 and 181:
11. IDENTIFYING INFORMATION AND PRI
- Page 182 and 183:
APPENDIX A-4: PROVISIONS FOR DBE PA
- Page 184 and 185:
EXHIBIT I APPENDIX A GENERAL PROVIS
- Page 186 and 187:
ARTICLE 5 - RECORDS, AUDITS, REPORT
- Page 188 and 189:
Section 12.05 No Claim Against Offi
- Page 190 and 191:
Appendix A (Architects and Engineer
- Page 192 and 193:
Appendix A (Architects and Engineer
- Page 194 and 195:
Appendix A (Architects and Engineer
- Page 196 and 197:
Appendix A (Architects and Engineer
- Page 198 and 199:
Appendix A (Architects and Engineer
- Page 200 and 201:
Appendix A (Architects and Engineer
- Page 202 and 203:
Appendix A (Architects and Engineer
- Page 204 and 205:
Appendix A (Architects and Engineer
- Page 206 and 207:
Appendix A (Architects and Engineer
- Page 208 and 209:
Appendix A (Architects and Engineer
- Page 210 and 211:
Appendix A (Architects and Engineer
- Page 212 and 213:
Appendix A (Architects and Engineer
- Page 214 and 215:
Appendix A (Architects and Engineer
- Page 216 and 217:
Appendix A (Architects and Engineer