25.10.2014 Views

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.6 Requisitions <strong>for</strong> Payment<br />

7.6.1 Requisitions <strong>for</strong> payment may be submitted as the work progresses, but not more often than once a<br />

month. Requisitions shall be in the authorized <strong>for</strong>m <strong>and</strong> shall set <strong>for</strong>th the <strong>services</strong> per<strong>for</strong>med by the Consultant <strong>and</strong> the<br />

total amount of partial payment requested. The total amount of partial payment requested shall be broken down into<br />

various categories, depending on the required <strong>services</strong> <strong>and</strong> the method of payment specified in the Task Order. Such<br />

payment categories may include the following: (1) Preliminary Design Fee, (2) Topographic Survey Fee, (3) Final<br />

Design Fee, (4) Services on a Time Card Basis, (5) Artwork, <strong>and</strong> (6) Reimbursable Services. The Consultant shall<br />

submit one original <strong>and</strong> three (3) copies of each requisition <strong>for</strong> payment.<br />

7.6.2 Requisitions must be accompanied by the documentation set <strong>for</strong>th below.<br />

(a)<br />

(b)<br />

Project Progress Report: The Consultant shall submit a current report indicating the percentage of<br />

completion of all required <strong>services</strong> <strong>for</strong> the Project. The progress report submitted as part of the payment<br />

requisition shall not constitute submission of the monthly Progress Report in accordance with the<br />

<strong>requirements</strong> set <strong>for</strong>th in the General Requirements.<br />

Payment of Fees: For any period <strong>for</strong> which the Consultant is requesting payment of any portion of the<br />

Fees set <strong>for</strong>th herein, the Consultant shall provide one of the statements set <strong>for</strong>th below.<br />

(1) Statement that the Consultant has received the Commissioner’s written approval of the required<br />

deliverable.<br />

(2) Statement that the Consultant is progressing the required work <strong>for</strong> the deliverable in a satisfactory<br />

<strong>and</strong> timely fashion. Partial payments <strong>for</strong> the deliverable may not exceed 50% of the lump sum<br />

fee <strong>for</strong> the same, unless the Consultant submits a draft of the deliverable demonstrating<br />

satisfactory progress of the work.<br />

(c)<br />

Time Card Services: For any period <strong>for</strong> which the Consultant is requesting payment <strong>for</strong> <strong>services</strong> on a<br />

time card basis, the Consultant shall submit the documentation set <strong>for</strong>th below:<br />

(1) Name <strong>and</strong> title of the Assigned Employee, as defined above.<br />

(2) Commissioner approval of the Assigned Employee, either approved Staffing Plan or<br />

documentation approving the Assigned Employee as a replacement.<br />

(3) All Inclusive Hourly Rate applicable to the Assigned Employee. The All Inclusive Hourly Rate<br />

<strong>for</strong> an Assigned Employee shall be the rate set <strong>for</strong>th in Exhibit C <strong>for</strong> the title <strong>for</strong> which the<br />

Commissioner determines the employee meets the minimum <strong>requirements</strong>.<br />

(4) Number of hours worked each day by the Assigned Employee <strong>for</strong> the week(s) in question during<br />

which the Assigned Employee actually per<strong>for</strong>med <strong>services</strong> <strong>for</strong> the Project on a time card basis.<br />

(5) Detailed time sheets completed by the Assigned Employee <strong>for</strong> the week(s) in question. Such<br />

detailed time sheets shall reflect all hours of service by the Assigned Employee, including<br />

without limitation: (1) actual hours during which the employee per<strong>for</strong>med <strong>services</strong> <strong>for</strong> this Project<br />

on a time card basis; (2) actual hours during which the employee per<strong>for</strong>med <strong>services</strong> <strong>for</strong> this<br />

Project covered under Fee(s); (3) actual hours during which the employee per<strong>for</strong>med <strong>services</strong> <strong>for</strong><br />

other projects; (4) non-billable hours, as defined above; (5) actual hours, if any, during which the<br />

Assigned Employee per<strong>for</strong>med <strong>services</strong> <strong>for</strong> this Project <strong>for</strong> which the Consultant is not entitled to<br />

compensation, <strong>and</strong> (6) any non-regular business hours.<br />

(6) Commissioner authorization <strong>for</strong> <strong>services</strong> during non-regular business hours, if applicable<br />

(d)<br />

Payment <strong>for</strong> Artwork: For any period <strong>for</strong> which the Consultant is requesting payment <strong>for</strong> artwork, the<br />

Consultant shall submit a statement indicating the percentage of completion of all required <strong>services</strong> by<br />

the artist, as well as the total actual cost of the artwork to date.<br />

(e) Reimbursable Services: For any period <strong>for</strong> which the Consultant is requesting payment <strong>for</strong><br />

Reimbursable Services, the Consultant shall submit the documentation set <strong>for</strong>th below:<br />

(1) Description of the Reimbursable Service the Consultant was directed to provide.<br />

(2) If payment is on a lump sum basis, a report on the progress of the work, indicating the percentage<br />

_____________________________________________________________________________________________<br />

CITY OF NEW YORK<br />

16 ENGINEERING DESIGN AND RELATED SERVICES<br />

DEPARTMENT OF DESIGN AND CONSTRUCTION REQUIREMENTS CONTRACT (LRG) SEPT. 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!