GENERAL REQUIREMENTS FOR DESIGN SERVICES<br />

The General Requirements set <strong>for</strong>th the basic <strong>requirements</strong> to be met in the per<strong>for</strong>mance of various <strong>design</strong> <strong>services</strong>.<br />

1. DEFINITIONS<br />

(i) The words “Preliminary Design” where used herein are understood to mean the collection of data; identification,<br />

study <strong>and</strong> resolution of <strong>design</strong> issues; <strong>and</strong> the development of approved Conceptual-Schematic Geometric Designs.<br />

(ii) The words “Preliminary Design Services” where used herein include the specific Preliminary Design Services<br />

identified in Section 2.3.A of these General Requirements <strong>and</strong> other <strong>design</strong> <strong>services</strong> that are needed to fully develop the<br />

Preliminary Design <strong>for</strong> a project including the preparation of a fully coordinated set of technical supplements, results <strong>and</strong><br />

recommendations of studies, <strong>and</strong> schematic geometric <strong>design</strong>s.<br />

(iii) The words “Final Design” where used herein are understood to mean development of detailed <strong>design</strong>s <strong>for</strong> street,<br />

sewer <strong>and</strong> water main work; the detailed <strong>design</strong> of all appropriate street elements <strong>and</strong> appurtenances; <strong>and</strong> the preparation<br />

of fully coordinated construction Contract Documents that are ready <strong>for</strong> bidding.<br />

(iv) The words “Final Design Services” where used herein include the specific Final Design Services identified in<br />

Section 2.3.A of these General Requirements <strong>and</strong> other <strong>design</strong> <strong>services</strong> that are needed to fully develop the Final Design<br />

<strong>for</strong> a project including fully coordinated final contract documents.<br />

(v) The words “Additional Professional Services” where used herein are understood to mean <strong>services</strong> which the<br />

Commissioner determines are required <strong>for</strong> the Project <strong>and</strong> are in addition to or outside of Preliminary Design Services<br />

<strong>and</strong>/or Final Design Services, including all necessary <strong>and</strong> usual components <strong>and</strong>/or <strong>services</strong> in connection with Preliminary<br />

Design Services <strong>and</strong>/or Final Design Services, as set <strong>for</strong>th in these General Requirements or the Specific Requirements.<br />

2. GENERAL DESCRIPTION OF SERVICES<br />

2.1. (a) SERVICES FOR A SPECIFIC PROJECT: The Consultant shall be required to provide the <strong>engineering</strong> <strong>design</strong><br />

<strong>and</strong> <strong>related</strong> <strong>services</strong> set <strong>for</strong>th in Article 6 of the Contract.<br />

(b) SERVICES ON A TASK ORDER BASIS: When a Requirements Contract is used, the Consultant shall be<br />

required to provide <strong>engineering</strong> <strong>design</strong> <strong>and</strong> <strong>related</strong> <strong>services</strong> <strong>for</strong> various infrastructure projects <strong>for</strong> the Department of Design<br />

<strong>and</strong> Construction on an as needed basis. In that event, the Commissioner shall issue a Task Order to the Consultant. The<br />

Consultant shall provide <strong>services</strong> in accordance with the Task Order <strong>for</strong> the Project specified therein. The Consultant shall<br />

not per<strong>for</strong>m <strong>services</strong> pursuant to the Requirements Contract until the Commissioner has issued a Task Order. The<br />

<strong>engineering</strong> <strong>design</strong> <strong>and</strong> <strong>related</strong> <strong>services</strong> the Consultant may be required to provide <strong>for</strong> the Project specified in the Task<br />

Order shall include without limitation the <strong>services</strong> set <strong>for</strong>th in Article 6 of the Contract<br />

2.2. PAYMENT FOR SERVICES: The terms <strong>and</strong> conditions regarding payment to the Consultant are set <strong>for</strong>th in Article<br />

7 of the Contract.<br />

2.3. TYPES OF SERVICES: The types of <strong>engineering</strong> <strong>design</strong> <strong>and</strong> <strong>related</strong> <strong>services</strong> that the Consultant is required to<br />

provide include preliminary <strong>and</strong> final <strong>design</strong> <strong>services</strong>, extra work <strong>and</strong> reimbursable <strong>services</strong>.<br />

A. Preliminary <strong>and</strong> Final Design Services: The scope <strong>for</strong> preliminary <strong>and</strong> final <strong>design</strong> <strong>services</strong> <strong>for</strong> a specific project may<br />

include any of the tasks listed below:<br />

(1) PROJECT DEVELOPMENT/IDENTIFICATION<br />

(2) TOPOGRAPHIC SURVEY<br />

(3) TRAFFIC STUDY PROGRAM<br />

(4) HARDWARE AND BASIN CONDITION INVENTORY<br />

(5) SUBSURFACE EXPLORATION PROGRAM<br />

(6) VAULT PROGRAMS<br />

(7) RAILROAD AND ABANDONED TROLLEY FACILITIES RESEARCH<br />

(8) ROADWAY PAVEMENT DESIGN<br />

(9) EMBANKMENT PROTECTION STUDY<br />

(10) SCHEMATIC GEOMETRIC DESIGN<br />

(11) ACQUISITION STUDY AND MAPPING<br />

(12) QUANTITY AND COST ESTIMATING<br />

NYC Department of Design <strong>and</strong> Construction<br />

Infrastructure, October 2012<br />

GR-4