utility survey documentation; traffic study; subsurface exploration data; alternative schematic <strong>design</strong> treatment(s);<br />

correspondence <strong>and</strong> other documentation, as required.<br />

4.1A DESIGN REPORT<br />

For Federally Funded projects, the Consultant shall prepare a Project Scoping <strong>and</strong> Final Design Reports <strong>for</strong> the project<br />

based on the results of its investigations. Based on the complexity of the project <strong>and</strong> the type of funding sources, the<br />

Project Scoping <strong>and</strong> Final Design Reports shall be in accordance with the NYSDOT Project Development Manual <strong>and</strong>/or<br />

the NYSDOT Procedures <strong>for</strong> Locally Administered Federal Aid Projects. The Design Report will serve as the <strong>engineering</strong><br />

report used to convey in<strong>for</strong>mation on the project conditions, needs, objectives, transportation conditions, environmental<br />

concerns, feasible alternatives, <strong>and</strong> cost basis <strong>for</strong> the selection of the preferred alternative.<br />

The Consultant shall follow the latest version of NYSDOT Project Development Manual <strong>and</strong>/or the NYSDOT Procedures<br />

<strong>for</strong> Locally Administered Federal Aid Projects <strong>for</strong> preparation of the Project Scoping Report/Final Design Report<br />

(PSR/FDR) to obtain <strong>design</strong> approval. The actual <strong>for</strong>mat <strong>and</strong> sections of the Design Report must follow the PSR/FDR Shell<br />

available on the NYSDOT website.<br />

The website <strong>for</strong> the NYSDOT Project Development Manual is:<br />

https://www.nysdot.gov/divisions/<strong>engineering</strong>/<strong>design</strong>/dqab/pdm<br />

The website <strong>for</strong> the NYSDOT Procedures <strong>for</strong> Locally Administered Federal Aid Projects is:<br />

https://www.nysdot.gov/divisions/operating/opdm/local-programs-bureau/locally-administered-federal-aid-projects<br />

In conjunction with the Design Report, the Consultant shall prepare the National Environmental Policy Act (NEPA) <strong>and</strong> the<br />

State Environmental Quality Review Act (SEQRA) checklists <strong>and</strong> the City Environmental Quality Review (CEQR) Process<br />

<strong>for</strong> inclusion in the Final Design Report. The determination <strong>and</strong> the checklist shall be included in the report as an appendix.<br />

The Design Report shall be submitted to the NYCDDC <strong>and</strong> other Agencies <strong>design</strong>ated by the Commissioner <strong>for</strong> review <strong>and</strong><br />

comments. Upon approval from the NYCDDC, the Design Report will be sent to NYSDOT <strong>for</strong> Final Design Report<br />

Approval.<br />

4.2 TOPOGRAPHIC SURVEY<br />

Under this task the Consultant shall execute a Topographic survey <strong>and</strong> produce a Composite Utility Plan in<br />

conjunction with the Project.<br />

A. LIMITS<br />

1. The location <strong>and</strong> limits of the Topographic Survey are described in the Specific Requirements <strong>for</strong> each project.<br />

2. The limits of the Topographic Survey(s) shall extend into intermediate intersections a distance of 50 feet, measured<br />

along the center line of the respective street from the building line projection, <strong>and</strong> 50 feet beyond the perimeter of all<br />

isl<strong>and</strong>s <strong>and</strong> gores. Additionally, the topographic survey shall include terminal intersections <strong>and</strong> extend 50 feet<br />

beyond into each intersection leg.<br />

3. The surveyor shall locate property possession lines within the limits of the Topographic Survey.<br />

B. GENERAL<br />

1. The Consultant shall submit, <strong>for</strong> approval, the names <strong>and</strong> experience portfolios of all persons <strong>and</strong> Sub Consultants<br />

proposed <strong>for</strong> use concerning Topographic <strong>and</strong> Utility Survey(s) be<strong>for</strong>e start of work.<br />

2. The Survey work shall include the field <strong>and</strong> office work, including drafting, required to make topographical <strong>and</strong> base<br />

line surveys, prepare Plan <strong>and</strong> Profile drawings <strong>and</strong> base line maps.<br />

3. In preparing the Plan <strong>and</strong> Profile drawings, the Consultant shall take cognizance of the basic minimum <strong>requirements</strong><br />

set <strong>for</strong>th herein, together with such other <strong>requirements</strong> as may be necessary <strong>for</strong> the complete fulfillment of this<br />

contract <strong>for</strong> the purpose <strong>for</strong> which it is intended.<br />

4. All survey work shall be in the English System (U.S. Survey Foot).<br />

5. All right-of-way (ROW) data, including baseline (centerline of ROW), baseline ties to survey control traverse,<br />

location of possession lines <strong>and</strong> location of property lines shall be prepared by a New York State licensed L<strong>and</strong><br />

Surveyor. All topographic <strong>and</strong> utility data shall be prepared by or under the direct supervision of a licensed L<strong>and</strong><br />

Surveyor. The Composite Utility Plan shall be prepared by a New York State licensed professional engineer.<br />

NYC Department of Design <strong>and</strong> Construction<br />

Infrastructure, October 2012<br />

GR-14