noted <strong>and</strong> reconciled, wherever possible, prior to the commencement of Seepage Basin <strong>and</strong>/or Highway Drain<br />

<strong>design</strong>.<br />

f) The Consultant shall study the area contiguous to the project <strong>and</strong> shall:<br />

1) Define <strong>and</strong> measure the tributary drainage areas;<br />

2) Develop storm water run-off factors based on actual field conditions; <strong>and</strong><br />

3) Calculate <strong>design</strong> run-off <strong>and</strong> hydraulic flow rates <strong>for</strong> each proposed seepage basin <strong>and</strong>/or highway<br />

drain using the appropriate New York City Department of Environmental Protection <strong>design</strong> criteria;<br />

g) The Consultant shall develop a soil boring locations plan to supplement the available soil data, as needed to<br />

complete the <strong>design</strong> of each proposed seepage basin, <strong>and</strong> shall incorporate said locations into the Subsurface<br />

Exploration Program provided <strong>for</strong> in this Contract;<br />

h) The Consultant shall coordinate the <strong>design</strong> proposals with private utilities <strong>and</strong> the Department of Environmental<br />

Protection to identify <strong>and</strong> mitigate utility interference issues relative to proposed borings, seepage basin <strong>and</strong><br />

highway drain locations, <strong>and</strong> shall incorporate approved utility accommodation work into the contract documents;<br />

i) The Consultant shall review the soil samples <strong>and</strong> the results of the soils analysis, soil classification <strong>and</strong><br />

permeability tests as obtained under the Subsurface Exploration Program, <strong>and</strong> shall determine the capacity of the<br />

soils to drain storm water at each proposed seepage basin location. The Consultant’s review shall include:<br />

1) All diaries, logs, test results, boring location plans, etc.;<br />

2) The soil samples <strong>and</strong> soil classification <strong>and</strong> analysis results;<br />

3) The results of soil permeability tests.<br />

j) The Consultant shall <strong>design</strong> the proposed seepage basin <strong>and</strong>/or highway drains system to accommodate the<br />

<strong>design</strong> storm water run-off including the depth <strong>and</strong> diameter of the seepage basins to be installed at each location;<br />

<strong>and</strong>/or the invert elevations, sizes <strong>and</strong> drain pipe material to be used, along with all manholes, <strong>and</strong> drain pipe<br />

support <strong>and</strong> protection required.<br />

k) The Consultant shall assemble in<strong>for</strong>mation, tests <strong>and</strong> analyses obtained, <strong>and</strong> shall prepare a Seepage Basin<br />

Design <strong>and</strong>/or Highway Drain Letter Report containing the compilation <strong>and</strong> analysis of data obtained, recommended<br />

locations <strong>for</strong> seepage basins <strong>and</strong>/or highway drains, including approximate street grade elevations (based upon a<br />

coordinated review of grades in conjunction with all other street <strong>design</strong> tasks included in the Specific Requirements<br />

of this Contract), basin depths, types of seepage basins, approximate seepage basin array(s), <strong>and</strong> proposed<br />

construction.<br />

l) The Consultant shall submit a draft of the Seepage Basin <strong>and</strong>/or Highway Drain Design letter report to the<br />

Commissioner <strong>for</strong> review <strong>and</strong> approval, <strong>and</strong> shall make revisions as the Commissioner may require.<br />

m) Upon approval of the draft report by the Commissioner, the Consultant shall h<strong>and</strong>-deliver to the Commissioner<br />

three (3) copies of the Seepage Basin <strong>and</strong>/or Highway Drain Design letter report, <strong>and</strong> original notes, sketches,<br />

calculations, etc., used in the preparation of the Report.<br />

n) The Consultant shall prepare Preliminary Seepage Basin <strong>and</strong>/or Highway Drains, Catch Basin <strong>and</strong> Basin<br />

Connection Construction Contract Documents including plans, specifications <strong>and</strong> Consultant's Estimate in<br />

accordance with the approved letter report, <strong>and</strong> shall submit the preliminary plans to the Commissioner, relevant<br />

City agencies, <strong>and</strong> to the utility companies <strong>for</strong> review comments <strong>and</strong> utility impact assessment <strong>and</strong> mitigation.<br />

o) The Consultant shall modify locations as required <strong>and</strong> incorporate appropriate comments into the Seepage<br />

Basin <strong>and</strong>/or Highway Drains <strong>design</strong>, <strong>and</strong> shall prepare Final Seepage Basin <strong>and</strong>/or Highway Drains Construction<br />

Contract Documents, including plans, specifications, Consultant's estimate, etc., <strong>for</strong> incorporation into the Contract<br />

Documents of the Project in accordance with the Street Design Element contained in the Specific Requirements of<br />

this Contract.<br />

NYC Department of Design <strong>and</strong> Construction<br />

Infrastructure, October 2012<br />

GR-61