g) Present the proposed tree planting <strong>and</strong> tree removal plan to the Department of Transportation (DOT) <strong>for</strong><br />

approval;<br />

h) Upon receipt of concurrence from the Commissioner <strong>and</strong> in conjunction with the Forester/Arborist/Tree<br />

Consultant, meet with representative(s) of the Department of Parks <strong>and</strong> Recreation (DPR) to present the proposed<br />

tree planting/tree removal program, obtain their concurrence <strong>and</strong>/or concerns, <strong>and</strong> modify the tree planting/tree<br />

removal proposals until DPR's approval is obtained.<br />

i) Incorporate the approved tree planting/tree removal plan into the Composite Contract Documents.<br />

4.18 SEEPAGE BASIN AND/OR HIGHWAY DRAIN DESIGN<br />

A. Under this task the Consultant shall provide <strong>for</strong> the preparation of Seepage Basin <strong>and</strong>/or Highway Drain Design(s)<br />

to be per<strong>for</strong>med in conjunction with the Project. This work shall include the collection of sewer data, the development of<br />

boring locations, the study of soils analyses <strong>and</strong> soils classification results, the determination of storm water flow rates, the<br />

preparation of Seepage Basin <strong>and</strong>/or Highway Drain Design Letter Report, <strong>and</strong> the preparation of Seepage Basin <strong>and</strong>/or<br />

Highway Drain Design, including manholes, basin connections <strong>and</strong> other appurtenances necessary <strong>for</strong> the proper<br />

functioning of the seepage basin <strong>and</strong>/or highway drain system(s).<br />

B. The scope of work <strong>for</strong> the Seepage Basin <strong>and</strong>/or Highway Drain Design includes per<strong>for</strong>mance of the following<br />

<strong>services</strong>:<br />

a) The Consultant shall research <strong>and</strong> check available records of the Department of Environmental Protection<br />

(DEP) Bureau of Sewers to obtain pertinent in<strong>for</strong>mation needed in the preparation of Seepage Basin <strong>and</strong>/or<br />

Highway Drain Design. The records to be researched <strong>and</strong> checked shall include, but not be limited to, the following:<br />

1) As-built sewer plans;<br />

2) Borough sewer maintenance records;<br />

3) Drainage Plans<br />

4) Proposed sewer construction <strong>and</strong> schedules;<br />

5) Previous seepage basin construction;<br />

b) The Consultant shall research <strong>and</strong> check available records of other City agencies <strong>and</strong> public utilities, including:<br />

1) The plotted utility survey as furnished <strong>for</strong> the Final Design of the Project.<br />

2) The records of various utilities regarding water mains, gas mains, electrical ducts, steam mains,<br />

<strong>and</strong> telephone <strong>and</strong> fire alarm systems.<br />

c) The Consultant shall research available boring logs <strong>and</strong> soils analysis <strong>and</strong> classification results.<br />

d) The Consultant shall coordinate the development of Seepage Basin <strong>and</strong>/or Highway Drain Design proposals<br />

with the Bureau of Sewers, <strong>and</strong> shall identify those locations requiring seepage basins <strong>and</strong>/or highway drains. The<br />

following are some of the factors that should be considered:<br />

1) Need <strong>for</strong> drainage facilities based upon present drainage patterns <strong>and</strong> flows (present grades<br />

maintained);<br />

2) Need <strong>for</strong> drainage facilities based upon future drainage patterns <strong>and</strong> flows (construction to legal<br />

grade, or to intermediate grades as determined in this Final Design Program);<br />

3) Lack of existing storm sewer or combined sewer facilities at the site(s);<br />

4) Possible future sewer construction at the site(s);<br />

5) Highway drain(s) discharge provisions;<br />

6) Where feasible, highway drains shall be proposed in preference to seepage basins.<br />

e) The Consultant shall visit the site <strong>and</strong> shall conduct a visual inspection to confirm <strong>and</strong>/or correlate the<br />

in<strong>for</strong>mation obtained from his research of available records with actual field conditions. Discrepancies shall be<br />

NYC Department of Design <strong>and</strong> Construction<br />

Infrastructure, October 2012<br />

GR-60