25.10.2014 Views

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EXHIBIT C<br />

TITLES AND ALL INCLUSIVE HOURLY RATES<br />

Titles: Staffing <strong>requirements</strong> are set <strong>for</strong>th below. Such staffing <strong>requirements</strong> specify the titles of personnel which the<br />

Consultant shall be required to provide, through its own employees <strong>and</strong>/or through its Subconsultants.<br />

All Inclusive Hourly Rates: All Inclusive Hourly Rates per title are set <strong>for</strong>th below. Such All Inclusive Hourly Rates<br />

shall apply as follows: (1) if the method of payment <strong>for</strong> the per<strong>for</strong>mance of <strong>services</strong> is through fee(s), the All Inclusive<br />

Hourly Rates shall be used as a basis <strong>for</strong> negotiating fees with the Consultant, <strong>and</strong> (2) if the method of payment <strong>for</strong> the<br />

per<strong>for</strong>mance of <strong>services</strong> is on a time card basis, All Inclusive Hourly Rates shall be used to calculate payment to the<br />

Consultant in accordance with Article 7.<br />

Increases/Decreases: The All Inclusive Hourly Rates set <strong>for</strong>th below are subject to increases <strong>and</strong>/or decreases in<br />

accordance with Article 7.<br />

Additional Titles: If an additional title(s) of personnel is required <strong>for</strong> a specific Project, the Commissioner shall<br />

establish the following: (1) additional required title(s), (2) minimum <strong>requirements</strong> per title, <strong>and</strong> (3) All Inclusive Hourly<br />

Rate per title. The All Inclusive Hourly Rate <strong>for</strong> the additional required title shall be calculated in accordance with the<br />

<strong>for</strong>mula set <strong>for</strong>th in Article 7.<br />

TITLE<br />

ASCE (A)<br />

NICET (N)<br />

GRADE<br />

ALL INCLUSIVE HOURLY RATE<br />

Project Manager<br />

Project Engineer<br />

Senior Civil Engineer<br />

Senior Structural Engineer<br />

Engineer<br />

Junior Engineer<br />

Urban Design/L<strong>and</strong>scape Manager, RLA<br />

Project / Senior L<strong>and</strong>scape Architect<br />

L<strong>and</strong>scape Architect<br />

Junior L<strong>and</strong>scape Architect<br />

Arborist/ Forester<br />

Survey Manager, R.L.S.<br />

Party Chief/Foreman<br />

Instrument Person<br />

Rod Person<br />

Senior Traffic Engineer<br />

Traffic Engineer<br />

Junior Traffic Engineer – Technician<br />

Project Environmental Engineer/Manager<br />

Senior Environmental Engineer/Planner<br />

Environmental Engineer<br />

Junior Environmental Engineer<br />

Certified Industrial Hygienist<br />

Industrial Hygienist<br />

Project Geotechnical Engineer / Manager<br />

Senior Geotechnical Engineer<br />

Geotechnical Engineer<br />

Project Scientist<br />

A-VI<br />

A-IV<br />

A-V<br />

A-V<br />

A-III<br />

A-II<br />

N-III<br />

N-II<br />

N-I<br />

A-V<br />

A-III<br />

A-II<br />

A-VI<br />

A-V<br />

A-III<br />

_____________________________________________________________________________________________<br />

CITY OF NEW YORK<br />

26 ENGINEERING DESIGN AND RELATED SERVICES<br />

DEPARTMENT OF DESIGN AND CONSTRUCTION REQUIREMENTS CONTRACT (LRG) SEPT. 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!