During the construction stages of the project the Consultant will be required to inspect <strong>and</strong> approve shop drawings,<br />

material samples <strong>and</strong> the l<strong>and</strong>scaping work being per<strong>for</strong>med by the Contractor to ensure that the l<strong>and</strong>scaping materials<br />

<strong>and</strong> the finished work meet the quality <strong>and</strong> st<strong>and</strong>ards specified.<br />

The Consultant will be required to visit the site at various stages of the l<strong>and</strong>scaping work to inspect the l<strong>and</strong>scaping being<br />

per<strong>for</strong>med, <strong>and</strong> shall provide such instructions <strong>and</strong> guidance to the Contractor as is necessary <strong>and</strong> appropriate to ensure<br />

that the required quality of the l<strong>and</strong>scaping work is achieved.<br />

The Commissioner will transmit the necessary shop drawings to the Consultant <strong>for</strong> review <strong>and</strong> approval <strong>and</strong> will, in<br />

consultation with the Consultant, advise the Consultant of the need <strong>and</strong> schedule <strong>for</strong> inspecting various phases of the<br />

l<strong>and</strong>scaping work as the work progresses.<br />

4.34 DESIGN OF MODIFICATIONS TO SUBWAY VENTILATORS<br />

1. Under this task the Consultant shall research <strong>and</strong> study the details of existing subway structures <strong>and</strong> facilities,<br />

develop preliminary <strong>and</strong> final <strong>design</strong>s, preliminary <strong>and</strong> final cost estimates, <strong>and</strong> specifications <strong>for</strong> modification of subway<br />

ventilators as needed to implement street reconstruction proposals.<br />

2. PRELIMINARY DESIGN<br />

(a) The Consultant shall utilize any topographic <strong>and</strong> utility data provided to the extent necessary <strong>for</strong> the proper<br />

completion of this task.<br />

(b) The Consultant shall supplement any survey <strong>and</strong> utility data provided by conducting additional research of Transit<br />

Authority, <strong>and</strong> public <strong>and</strong> private utilities’ records; <strong>and</strong> by conducting additional field surveys to ensure that there is<br />

adequate <strong>and</strong> accurate data to identify possible <strong>design</strong> alternatives <strong>and</strong> to fully develop the <strong>design</strong> details.<br />

(c) The Consultant shall develop <strong>and</strong> provide the Commissioner with an estimate of the number of days <strong>and</strong> locations<br />

at which it intends to have personnel conducting surveys within the subway structure. The Consultant shall coordinate,<br />

with the Department, the development of a Transit Authority Force Account to allow the City to reimburse the Transit<br />

Authority <strong>for</strong> the cost of its personnel assigned to facilitate the Consultant’s field surveys of the subway structure <strong>and</strong> its<br />

facilities.<br />

(d) The Consultant shall identify <strong>design</strong> alternatives <strong>for</strong> modifying the subway ventilator(s) to allow <strong>for</strong> implementation of<br />

the street reconstruction proposals. Proposed modifications may include, but not be limited to, relocation of ventilators,<br />

<strong>and</strong> modification of the subway structure <strong>and</strong> facilities.<br />

(e) The Consultant shall develop <strong>design</strong> alternatives in full coordination with the Transit Authority. All modifications to<br />

the subway structure <strong>and</strong> Transit Authority facilities are to be <strong>design</strong>ed in accordance with <strong>design</strong> criteria stipulated by the<br />

Transit Authority, or recommended by the Consultant <strong>and</strong> accepted by the Transit Authority. Design details shall con<strong>for</strong>m<br />

to the Transit Authority’s st<strong>and</strong>ards.<br />

(f) The Consultant shall prepare preliminary drawings <strong>for</strong> the <strong>design</strong> alternatives identified. The preliminary drawings<br />

shall include plans, profiles <strong>and</strong> cross sections drawn to scale; shall indicate overall dimensions of existing structural<br />

elements that are to be modified <strong>and</strong> of the new construction proposed including hardware <strong>and</strong> equipment that must be<br />

removed <strong>and</strong>/or installed.<br />

(g) The Consultant shall make a preliminary assessment of the impact that each <strong>design</strong> alternative will have on existing<br />

sewers, water mains, <strong>and</strong> all other City owned facilities, identify <strong>and</strong> recommend measures that can be implemented to<br />

mitigate those impacts, <strong>and</strong> prepare preliminary drawings <strong>for</strong> the mitigation measures recommended.<br />

(h) The Consultant shall submit the preliminary drawings <strong>for</strong> the <strong>design</strong> alternatives, including details of proposed City<br />

owned utilities impact mitigation measures, to all private utility companies that own <strong>and</strong> operate facilities within the project<br />

limits. The Consultant shall ask each utility company to make a preliminary assessment of the impact of each <strong>design</strong><br />

alternative on its facilities <strong>and</strong> to identify private utilities impact mitigation proposals <strong>for</strong> each alternative.<br />

(i) The Consultant shall develop preliminary estimates of the cost of implementing each <strong>design</strong> alternative considered<br />

including the cost of measures proposed to mitigate City owned utility impacts.<br />

(j) The Consultant shall identify, on the Preliminary Drawings, the existing utilities that may be impacted <strong>and</strong> shall<br />

submit the preliminary drawings <strong>and</strong> preliminary cost estimates <strong>for</strong> the <strong>design</strong> alternatives to the Commissioner along with<br />

recommendations, including justification, <strong>for</strong> selection of a preferred alternative(s). The Consultant shall meet with the<br />

Commissioner <strong>and</strong> present the <strong>design</strong> alternatives, recommendations <strong>and</strong> justifications.<br />

NYC Department of Design <strong>and</strong> Construction<br />

Infrastructure, October 2012<br />

GR-77