25.10.2014 Views

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EXHIBIT E<br />

M/WBE SUBCONTRACTOR UTILIZATION PLAN<br />

This Exhibit does not apply if the Project is a Federal Aid Project.<br />

M/WBE SUBCONTRACTOR UTILIZATION PLAN: The Consultant’s M/WBE Subcontractor Utilization Plan is<br />

set <strong>for</strong>th on the following pages. Such M/WBE Subcontractor Utilization Plan was submitted by the Consultant as part<br />

of its proposal <strong>for</strong> the Contract.<br />

_____________________________________________________________________________________________<br />

CITY OF NEW YORK<br />

31 ENGINEERING DESIGN AND RELATED SERVICES<br />

DEPARTMENT OF DESIGN AND CONSTRUCTION REQUIREMENTS CONTRACT (LRG) SEPT. 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!