25.10.2014 Views

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PROJECT: HWDRMX02L, HWDRKR02L, HWDRQ02L<br />

PIN: 8502013VP0008P-10P<br />

5. Technical Approach<br />

The proposer shall submit a response to each item listed below. The proposer‘s<br />

response shall be limited to a total of four (4) pages.<br />

(a)<br />

(b)<br />

(c)<br />

Describe the proposer‘s methodology <strong>for</strong> resolving important technical <strong>and</strong><br />

administrative issues which may arise in connection with infrastructure Design<br />

projects.<br />

Describe the proposer's methodology <strong>for</strong> tracking <strong>and</strong> maintaining project‘s budget<br />

<strong>and</strong> schedule.<br />

Describe the proposer‘s own technical approach <strong>and</strong> <strong>design</strong> procedures to<br />

complete each of the tasks listed below. For the purpose of this item, the proposer<br />

shall assume that these tasks are in connection with a typical residential street<br />

Design project.<br />

o<br />

o<br />

o<br />

o<br />

o<br />

Schematic Geometric Design<br />

Street Design<br />

Street Grade <strong>and</strong> Drainage Study<br />

Sustainable Design including Best Management Practice (BMP) <strong>for</strong> Storm<br />

water.<br />

Procedure <strong>for</strong> preparation <strong>and</strong> obtaining approval <strong>for</strong> Design Report <strong>for</strong><br />

Federally Funded Projects<br />

6. Firm‘s Capability:<br />

The proposer shall submit Attachment 5, indicating its current <strong>and</strong> anticipated workload<br />

with DDC <strong>and</strong> New York City Department of Transportation. In completing Attachment<br />

5, the proposer shall list any Requirements Contracts it holds, as well as each individual<br />

Task Order <strong>and</strong> Supplemental Task Order issued pursuant to such Requirements<br />

Contracts.<br />

7. Per<strong>for</strong>mance Evaluation(s)<br />

Proposers without relevant NYC experience<br />

• State <strong>for</strong> the record that the proposer does not have relevant New York City<br />

experience.<br />

• Provide indicators of the quality of the experience described in the proposal,<br />

including per<strong>for</strong>mance evaluations issued by comparable entities responsible <strong>for</strong><br />

the development <strong>and</strong> maintenance of urban infrastructure assets.<br />

8. Statement of Underst<strong>and</strong>ing:<br />

The Statement of Underst<strong>and</strong>ing <strong>for</strong>m included as Attachment 1 of this RFP should be<br />

signed by a responsible partner or corporate officer of the proposing firm <strong>and</strong> submitted<br />

with firm‘s Technical Proposal.<br />

RFP-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!