25.10.2014 Views

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

requirements contracts for engineering design and related services ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PROJECT: HWDRMX02L, HWDRKR02L, HWDRQ02L<br />

PIN: 8502013VP0008P-10P<br />

9. Acknowledgement of Addenda:<br />

The Acknowledgement of Addenda <strong>for</strong>m (Attachment 7) serves as the proposer‘s<br />

acknowledgement of the receipt of addenda to this RFP that may have been issued by<br />

the Agency prior to the proposal due date <strong>and</strong> time. The proposer should complete this<br />

<strong>for</strong>m as instructed on the <strong>for</strong>m.<br />

C. Fee Proposal (All Inclusive Hourly Rates)<br />

A <strong>for</strong>m <strong>for</strong> submission of the Fee Proposal is included as Attachment 6 to the RFP. The<br />

proposer must submit the Fee Proposal in a separate, clearly labeled, sealed package. The<br />

proposer must complete the Fee Proposal as per instructions set <strong>for</strong>th in Attachment 6.<br />

D. Proposal Package Contents (―Checklist‖)<br />

The Proposal Package shall consist of the following FOUR packages. Each package shall be<br />

clearly marked with the Project Name, Project Identification Number <strong>and</strong> the Name of the<br />

Proposer.<br />

1. Technical Proposal (1 original <strong>and</strong> 5 copies):<br />

Sealed envelope, clearly marked as ―Technical Proposal‖, including<br />

Items listed in Section IV B of the RFP<br />

Completed Forms 254 <strong>and</strong> 255<br />

Statement of Underst<strong>and</strong>ing (Attachment 1)<br />

Completed <strong>and</strong> Notarized Proposer‘s (Attachment 2)<br />

Certification of Compliance with Iran<br />

Divestment Act<br />

Identification of Subconsultants (Attachment 3)<br />

Identification of Key Personnel (Attachment 4)<br />

Current <strong>and</strong> Anticipated Workload Disclosure (Attachment 5)<br />

Acknowledgement of Addenda (Attachment 7)<br />

DBE Participation Plan (Attachment 10)<br />

2. Subcontractor Utilization Plan (1 original): (Attachment 9)<br />

Separate sealed envelope, clearly marked as<br />

―Subcontractor Utilization Plan‖.<br />

3. Doing Business Data Form (Attachment 11)<br />

Separate sealed envelope clearly marked as<br />

―Doing Business Data Form‖<br />

4. Fee Proposal (1 original): (Attachment 6)<br />

Separate sealed envelope clearly marked as<br />

―Fee Proposal‖<br />

RFP-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!