(iii)<br />

(iv)<br />

The Consultant shall per<strong>for</strong>m a preliminary assessment <strong>for</strong> the presence of underground utilities by<br />

reviewing available utility records.<br />

Be<strong>for</strong>e engaging in any field reconnaissance, the Consultant shall take full advantage of visual aids<br />

available on the internet in order to confirm selection sites meet NYC DEP <strong>and</strong> NYC DOT criteria, including<br />

NYC DEP database(s), Laser Image Detection <strong>and</strong> Ranging (LIDAR) maps, <strong>and</strong> any other topographical<br />

mapping resources.<br />

Upon approval, the Consultant will then proceed as directed by DDC with a green infrastructure subsurface exploration<br />

program, as described in Item K of Section 4.5, Subsurface Exploration.<br />

Additionally the Consultant shall provide the estimated volume of stormwater runoff captured at each potential location,<br />

calculated as per NYC DEP St<strong>and</strong>ard Operating Procedure #001/2011 or another method approved by DDC, <strong>and</strong> any<br />

other quantitative benefits associated with recommended green infrastructure.<br />

i. The Consultant shall develop/recommend not more than two alternate l<strong>and</strong>scape treatments <strong>for</strong> the project. These<br />

l<strong>and</strong>scape treatments shall correspond to the schematic geometric treatments as developed by the Consultant, <strong>and</strong> shall<br />

include, but not be limited to, such items as curb <strong>and</strong> sidewalk treatments; tree planting; pedestrian amenities; street <strong>and</strong><br />

pedestrian lighting; street furniture; signage; <strong>and</strong> traffic signal systems.<br />

j. The Consultant shall identify <strong>and</strong> quantify all impacts <strong>for</strong> each alternative.<br />

k. The Consultant shall present each of the proposed L<strong>and</strong>scape treatment alternatives in schematic plan view(s)<br />

using a “modified” clean base <strong>for</strong>mat. The modified clean base plans shall be re<strong>for</strong>matted/matched to present linear<br />

continuity <strong>for</strong> individual thoroughfares/segments/routes. Suitable key location figures <strong>and</strong>/or key windows shall be<br />

employed, <strong>and</strong> cross-sections shall be required where appropriate. All elements of the Schematic L<strong>and</strong>scape/Urban<br />

Design presentation plans, including sheet size, scale, sheet coverage <strong>and</strong> indexing, shall be subject to the approval of the<br />

Commissioner.<br />

l. The Consultant shall submit the proposed Schematic L<strong>and</strong>scape/Urban Design(s) to the Commissioner, <strong>for</strong> review.<br />

Upon approval, the Consultant shall present the recommended schematic <strong>design</strong> to other Agencies <strong>design</strong>ated by the<br />

Commissioner, <strong>and</strong> the Public Design Commission <strong>for</strong> their review <strong>and</strong> comments; <strong>and</strong> to various other interested parties,<br />

as directed by the Commissioner, <strong>for</strong> their comment(s).<br />

m. The Consultant shall evaluate all comments received <strong>and</strong> shall analyze each concern. Upon consultation with the<br />

Department’s Infrastructure Design Division the Consultant shall prepare a letter report to the Department summarizing all<br />

comments <strong>and</strong> concerns, <strong>and</strong> making all necessary recommendations.<br />

n. The Consultant shall be required to either modify the original schematic <strong>design</strong> or prepare one additional alternative<br />

schematic <strong>design</strong> responding to identified concerns where, in the judgment of the Consultant <strong>and</strong> the Commissioner, the<br />

adjustments/modifications are in the best interests of the City of New York, are technically defensible <strong>and</strong> represent<br />

acceptable architectural practice.<br />

o. The Consultant shall submit the proposed Schematic L<strong>and</strong>scape/Urban Design to the Commissioner <strong>for</strong> review.<br />

Upon acceptance by the Commissioner, the Consultant shall present the recommended schematic <strong>design</strong> to other<br />

Agencies <strong>design</strong>ated by the Commissioner, <strong>and</strong> to the affected Community Planning Board(s), <strong>and</strong> the Public Design<br />

Commission at <strong>for</strong>mal public meetings/hearings, <strong>and</strong> shall incorporate the schematic <strong>design</strong> into a Schematic<br />

L<strong>and</strong>scape/Urban Design Technical Supplement.<br />

p. Upon acceptance of the final Schematic L<strong>and</strong>scape/Urban Design by the Department <strong>and</strong> upon receipt of written<br />

notice to proceed by the Commissioner, the Consultant shall commence work in conjunction with the Final Design Services<br />

of the Project.<br />

4.32 FINAL LANDSCAPE/URBAN DESIGN<br />

Under this task the Consultant shall provide <strong>for</strong> the preparation of a Final L<strong>and</strong>scape/Urban Design including the provision<br />

of pedestrian amenities to be per<strong>for</strong>med in conjunction with the Project.<br />

1. The Consultant shall provide the following <strong>services</strong>:<br />

a. The preparation of Final Construction Contract Documents <strong>for</strong> L<strong>and</strong>scaping/Urban Design work, which shall be<br />

advanced in two phases as follows:<br />

NYC Department of Design <strong>and</strong> Construction<br />