08.11.2014 Views

2454 final report.pdf - Agra CEAS Consulting

2454 final report.pdf - Agra CEAS Consulting

2454 final report.pdf - Agra CEAS Consulting

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Evaluation of the Community Plant Health Regime: Final Report<br />

DG SANCO Evaluation Framework Contract Lot 3 (Food Chain)<br />

4 The development of the future EU plant health policy<br />

4.1 Assessment of future needs<br />

This section summarises the findings of the evaluation on the CPHR performance to date,<br />

taking into consideration EQ 23 and EQ 24 (area K) of the ToR.<br />

4.1.1 Strength and weaknesses, opportunities and threats<br />

EQ 23: What are the major strengths and weaknesses, opportunities and threats of the<br />

CPHR, based on the conclusions of all previous questions, and which areas of<br />

improvement can be identified?<br />

The main strengths, weaknesses, opportunities and threats for each of the main themes of the<br />

CPHR were outlined in detail in the previous sections of this Report. The following table<br />

captures the main overarching elements, to provide a succinct SWOT analysis of the CPHR as<br />

it currently stands:<br />

Food Chain Evaluation Consortium 291

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!