08.11.2014 Views

2454 final report.pdf - Agra CEAS Consulting

2454 final report.pdf - Agra CEAS Consulting

2454 final report.pdf - Agra CEAS Consulting

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Options<br />

(most recommended)<br />

6.Emergency actions<br />

Early<br />

detection<br />

Early<br />

response<br />

Specific objective: better prevention<br />

Risk<br />

basis<br />

Operational objectives:<br />

Definition of Incentives Clarification 309 Public/political<br />

responsibilities<br />

awareness<br />

Food Chain Evaluation Consortium 385<br />

Evaluation of the Community Plant Health Regime: Final Report<br />

DG SANCO Evaluation Framework Contract Lot 3 (Food Chain)<br />

Horizon scanning High<br />

Compulsory development of<br />

contingency plans according to<br />

harmonized framework<br />

Speed up process for adoption<br />

and adaptation of both emergency<br />

and control/eradication measures<br />

7.Plant Passport system<br />

Clarify the scope and level of PP<br />

application, in terms of:<br />

a. Plants; b. Marketing stage<br />

Priority<br />

Need for further assessment<br />

High To be analysed whether these<br />

should be general or pest<br />

specific; degree of involvement<br />

of stakeholders<br />

High<br />

Medium Further detailed analysis of<br />

scope required<br />

Harmonise PP document Medium A separate study is<br />

recommended in order to<br />

examine scope for<br />

harmonisation<br />

8. Protected zones<br />

Status quo (with improvements)of<br />

PZs:<br />

a. Improve surveillance targets,<br />

b. Involve stakeholders,<br />

c. Harmonised eradication<br />

programmes,<br />

d. ending status on time<br />

9.Incentives<br />

Extend current scope of<br />

solidarity: Eradication measures<br />

(current scope): a. Extend (within<br />

current scope) to cover loss of<br />

destroyed material<br />

Extend current scope of<br />

solidarity: New measures<br />

Measures for co-financing<br />

consideration may include e.g.<br />

surveillance, contingency<br />

planning, prevention of emerging<br />

risks and emergency actions.<br />

Further recommendations<br />

Medium More detailed analysis needed<br />

of implications of moving to<br />

PFA and possible coexistence<br />

of PZs and PFAs<br />

High Further detailed analysis of<br />

scope required<br />

High Further detailed analysis of<br />

scope required

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!