<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 159 of 350<br />

4.5.6 <strong>PDGS</strong> END-TO-END OPERATIONS<br />

On a daily basis, the <strong>PDGS</strong> will schedule the CGS network for data-reception according to<br />

the mission plan preliminarily settled with the FOS (cf. 4.5.3.1). Then, as driven by the<br />

downlink plan (cf. 4.5.4.2), the <strong>PDGS</strong> will operate systematically via configurable rules<br />

commanding all elaboration steps cascading from data-reception, including:<br />

○ Antenna acquisition, signal demodulation, front-end processing, Level-0 processing<br />

and archiving (cf. sections 4.5.4.3.2 for MSI data and 4.5.5 for HKTM data);<br />

○ Systematic processing of all MSI acquired raw-data to higher levels (cf. sections<br />

4.5.4.3.2 and 4.5.4.6);<br />

○ Systematic essential quality-control over the MSI acquired and processed data (cf.<br />

section 4.5.4.7);<br />

○ Systematic inventory and archiving of all data with well-defined retention (cf. section<br />

4.5.4.9.1);<br />

○ Systematic and data-driven internal data circulation among the distributed stations and<br />

centres according to a coordinated and well-defined configuration (cf. section<br />

4.5.4.9.2)<br />

○ Systematic data distribution towards external interfaces (cf. sections 4.5.2 for MSI<br />

products and 4.5.5 for HKTM)<br />

This overall process will be carried out in a FIFO manner as driven by the downlink scenario<br />

defined in section 4.5.4.2.<br />

The generation of the Level-2A prototype product will be triggered interactively by authorised<br />

users via the hosted processing functionality (cf. 4.5.4.6).<br />

As driven either by the Cal/Val agenda or recurrently following a predefined agenda, the<br />

<strong>PDGS</strong> will perform the following operations in the background:<br />

○ Systematic Cal/Val activities (cf. section 4.5.4.10) with retrofit on the instrument and<br />

ground-processing chains configurations (cf. section 4.5.3.3);<br />

○ Systematic Quality Control over the globally processed data and on the overall mission<br />

performance (cf. section 4.5.3.2) in the short to longer term.<br />

Contingency operations will be triggered on malfunctions in the nominal data flow covering:<br />

○ Recovery of malfunctions in the Level-0 processing chain (cf. section 4.5.4.3.2),<br />

○ Recovery of higher-level productions (cf. section 4.5.4.8.2),<br />

○ Recovery of problems throughout the data archiving and circulation network (cf.<br />

section 4.5.4.9).<br />

Reprocessing operations will be performed as driven by the required evolutions of the<br />

<strong>Sentinel</strong>-2 Level-1 and Level-2 datasets in the long term (cf. section 4.5.4.8.1).<br />

All above operations are described in more details in Chapter-6 according to the functional<br />

breakdown provided in Chapter-5.<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.