<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 309 of 350<br />

6.16.5 OPERATION SCENARIOS – VERIFICATION OF THE INSTRUMENT<br />

DATA AND QUALITY CONTROL PROCESSORS<br />

6.16.5.1 New Processor Version Verification<br />

This operational scenario stands for the verification of a new processor version and its fine<br />

tuning prior to its official release and deployment. This scenario is complementary to the<br />

Reference Platform validation activities focusing on the fine tuning of the new processor<br />

version for the different processing centres and their associated processing scenarios.<br />

The following steps are identified for this operation scenario:<br />

1) Reception of the new processor version (including a self installing package containing<br />

processor task executables, processor configuration files, associated documentation<br />

and installation checkout test data) from the RP function;<br />

2) Execution of the processor verification plan for the new processor version using<br />

collocated DPC function embedding IDP and OLQC functionalities;<br />

3) Delivery of the verification results to the RP function.<br />

The use case of this operation scenario is the verification of new versions of the elements<br />

composing the IPF (i.e. new IDP and OLQC functions versions).<br />

6.16.5.2 Investigation of Anomalies on the Processing Chain<br />

This operational scenario stands for the investigation activities on the processing chain after<br />

the detection of processing anomalies.<br />

The following steps are identified for this operation scenario:<br />

1) Ad-hoc investigation of the processor behaviour on the collocated DPC infrastructure<br />

at the MPAC;<br />

2) Entering of an anomaly report via the RP function if a problem is identified at dataprocessor<br />

level.<br />

6.16.6 OPERATION SCENARIOS – END-TO-END SYSTEM PERFORMANCE<br />

MONITORING<br />

6.16.6.1 Interactive Monitoring<br />

This scenario stands for the operator-driven visualisation in real-time of the <strong>PDGS</strong> elaboration<br />

flows along mission-time such as:<br />

○ Satellite planning and configuration along time, planned and unplanned platform or<br />

payload unavailability periods;<br />

○ Data reception at the station providing the statuses of the demodulators and front-end<br />

processing activities along the acquisition segment;<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!