29.11.2014 Views

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 297 of 350<br />

Staff involved in the mission-planning activities on both FOS and <strong>PDGS</strong> sides are<br />

available during nominal working hours only (operations performed on weekly days);<br />

S/band opportunities assigned to <strong>Sentinel</strong>-2 mission for the mission uplink plan (cf.<br />

4.3.7.1);<br />

X-Band ground stations scheduling duty cycle for the downlink-passes booking beforehand<br />

according to the planned activities;<br />

<br />

Additional operation constraints derived from the EDRS exploitation.<br />

6.15.3 OPERATION SCENARIOS<br />

6.15.3.1 Planning Configuration<br />

This scenario accounts for the operator-driven MPL function configuration covering all<br />

preparatory activities prior to the mission plan generation. The following activities are<br />

considered part of the configuration scope:<br />

Ingestion and handling of the applicable Mission Reference Files released by the MCC<br />

function (i.e. mainly the FOS files required for planning acknowledge and ground<br />

station scheduling activities);<br />

<br />

Planning templates rules generation and their activation to span the Image-Acquisition-<br />

Plan;<br />

Characterisation of the Downlink capabilities assigned to the <strong>Sentinel</strong>-2 (Coarse<br />

Downlink Budget);<br />

Management of the FOS released Spacecraft Safety Constraints File with impact on<br />

the <strong>PDGS</strong> mission planning activities;<br />

Internal configuration parameters such as planning mode (automatic or manual,<br />

generation frequency, default plan coverage, etc.);<br />

The <strong>PDGS</strong>/MPL function configuration comprises activities that are performed automatically<br />

and others attached to operator handling.<br />

The operator defines and introduces the mission planning configuration parameters for the<br />

latter mission planning generation activities. See below a proposed example of some<br />

parameters that can be defined and used to characterise the CGS/LGS usage by the two<br />

spacecrafts units.<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!