29.11.2014 Views

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 87 of 350<br />

Those processing steps are theoretically applied on a continuous input image flow<br />

corresponding to the data generation process performed on-board. As such, they require<br />

small portions of image data acquired along-track before and after the data to be processed<br />

hereafter referred to as “radiometric processing margins”.<br />

The overall processing margin is computed by adding up the different contributions needed<br />

corresponding to slightly more than 10% of a scene as reported in [RD-30]:<br />

○ For the decompression step (Level-1A), 32 lines of each band are required before and<br />

after. The worst-case corresponds to 1/12 th of a scene for 60m bands.<br />

○ For the deconvolution of 10m bands (Level-1B) 50 image lines are required before and<br />

after. This corresponds to slightly less than 1/46 th of a scene.<br />

4.3.9.2 Geometry Processing Constraints<br />

4.3.9.2.1 Image Datation<br />

The image datation model is a key element for the geolocation accuracy of the final products.<br />

Referring to the datation process performed on-board as summarised in paragraph 3.5.2.3.3,<br />

a global error-budget was computed (cf. Table 4-1 below) based on Bias (B) and Rate (R)<br />

error-budget figures inherited from the instrument design.<br />

The first column represents the overall accuracy obtained with raw time stamp information<br />

(CUCM_s), and the second one represents the one corrected though the MSI internal<br />

correction (Δ_s).<br />

Contributor Type Budget based on MSI CUC time taking<br />

into account internal time correction (Δ s)<br />

Scene start time B<br />

R<br />

+/- 0.119 µs<br />

+/- 0.09 µs<br />

Scene duration B<br />

R<br />

+/- 0.428 µs<br />

+/- 0.06 µs<br />

Integration period B<br />

R<br />

+/- 0.001 µs<br />

+/- 0.01 µs<br />

Total<br />

B<br />

R<br />

+/- 0.548 µs<br />

+/- 0.109 µs<br />

B+R +/- 0.657 µs<br />

Table 4-1 Datation Accuracy Budgets<br />

This ±0.657μs datation error resulting from the enhanced time correction performed on-board<br />

is expected to contribute to less than 0.5 cm on-ground when reported on the geolocation<br />

error budget, which is negligible.<br />

As return of experience from previous missions, a refinement of the datation model was<br />

nevertheless recommended and will be implemented in the GPP as an optional processing<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!