<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 164 of 350<br />

Activity or<br />

Milestone<br />

<strong>PDGS</strong><br />

development<br />

Reference<br />

Configuration<br />

Deployed<br />

Configuration<br />

State S2A State S2B State S2A State S2B<br />

Remarks<br />

Development N/A <strong>PDGS</strong> is integrated on RP<br />

<strong>PDGS</strong> is deployed and<br />

<strong>PDGS</strong> IV&V<br />

Preliminary<br />

verified in its definite physical<br />

layout<br />

<strong>PDGS</strong> is pre-qualified for<br />

<strong>PDGS</strong> QR<br />

operating on the constellation<br />

Qualified<br />

<strong>Sentinel</strong>-2 Ground-Segment is<br />

OSV<br />

integrated and validated for<br />

pre-operations<br />

GS-AR validated Qualified OSV excludes SVTs for S2B<br />

ORR<br />

S2A launch<br />

S2A Phase-E1<br />

S2A IOCR &<br />

<strong>PDGS</strong> AR<br />

Delta-S2B IV&V<br />

dry-runs<br />

completed<br />

S2B HW<br />

deployment &<br />

delta-S2B IV&V<br />

Delta-S2B <strong>PDGS</strong>-<br />

QR<br />

Delta-S2B OSV<br />

Delta-S2B GS-AR<br />

Delta-S2B ORR<br />

S2B launch<br />

S2B Phase-E1<br />

S2B IOCR<br />

reference-qualified<br />

S2B specific deltadevelopment<br />

referencequalified<br />

development<br />

reference-qualified<br />

preoperational<br />

N/A<br />

Ground-segment configuration<br />

is frozen until S2A launch.<br />

From now on, <strong>PDGS</strong> state for<br />

S2B is assumed by not<br />

formally qualified.<br />

S2A commissioning is<br />

performed while <strong>PDGS</strong> is<br />

validated for full operation<br />

Mission enters Phase-E2 with<br />

S2A<br />

Specific S2B updates are<br />

integrated on RP. RP still<br />

maintains reference-qualified<br />

configuration deployed in<br />

operations<br />

S2B updates are referencequalified<br />

on RP<br />

operational preliminary<br />

<strong>PDGS</strong> hardware is upgraded<br />

to support S2B while <strong>PDGS</strong> is<br />

in full operations for S2A<br />

<strong>PDGS</strong> is qualified for<br />

Qualified<br />

operating on the constellation<br />

OSV non-regression and S2B<br />

specific SVTs are performed<br />

<strong>Sentinel</strong>-2 ground-segment is<br />

validated<br />

validated for pre-operations<br />

ground-segment configuration<br />

preoperational<br />

is frozen until S2B launch<br />

S2B commissioning is<br />

performed<br />

<strong>Sentinel</strong>-2 Mission enters full<br />

Operational<br />

routine phase<br />

Table 4-9 <strong>Sentinel</strong>-2 Spacecraft Units Phase-In Scenario within the <strong>PDGS</strong><br />

It shows in particular:<br />

○ A RP configuration accurately following the deployed <strong>PDGS</strong> configuration<br />

systematically reference-qualified for the constellation;<br />

○ A pre-launch version of the <strong>PDGS</strong> already (pre-)qualified for the constellation following<br />

initial <strong>PDGS</strong> IV&V activities;<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.