<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />
Issue 1 Revision 2 (draft) - 25.07.2010<br />
GMES-GSEG-EOPG-TN-09-0008<br />
page 164 of 350<br />
Activity or<br />
Milestone<br />
<strong>PDGS</strong><br />
development<br />
Reference<br />
Configuration<br />
Deployed<br />
Configuration<br />
State S2A State S2B State S2A State S2B<br />
Remarks<br />
Development N/A <strong>PDGS</strong> is integrated on RP<br />
<strong>PDGS</strong> is deployed and<br />
<strong>PDGS</strong> IV&V<br />
Preliminary<br />
verified in its definite physical<br />
layout<br />
<strong>PDGS</strong> is pre-qualified for<br />
<strong>PDGS</strong> QR<br />
operating on the constellation<br />
Qualified<br />
<strong>Sentinel</strong>-2 Ground-Segment is<br />
OSV<br />
integrated and validated for<br />
pre-operations<br />
GS-AR validated Qualified OSV excludes SVTs for S2B<br />
ORR<br />
S2A launch<br />
S2A Phase-E1<br />
S2A IOCR &<br />
<strong>PDGS</strong> AR<br />
Delta-S2B IV&V<br />
dry-runs<br />
completed<br />
S2B HW<br />
deployment &<br />
delta-S2B IV&V<br />
Delta-S2B <strong>PDGS</strong>-<br />
QR<br />
Delta-S2B OSV<br />
Delta-S2B GS-AR<br />
Delta-S2B ORR<br />
S2B launch<br />
S2B Phase-E1<br />
S2B IOCR<br />
reference-qualified<br />
S2B specific deltadevelopment<br />
referencequalified<br />
development<br />
reference-qualified<br />
preoperational<br />
N/A<br />
Ground-segment configuration<br />
is frozen until S2A launch.<br />
From now on, <strong>PDGS</strong> state for<br />
S2B is assumed by not<br />
formally qualified.<br />
S2A commissioning is<br />
performed while <strong>PDGS</strong> is<br />
validated for full operation<br />
Mission enters Phase-E2 with<br />
S2A<br />
Specific S2B updates are<br />
integrated on RP. RP still<br />
maintains reference-qualified<br />
configuration deployed in<br />
operations<br />
S2B updates are referencequalified<br />
on RP<br />
operational preliminary<br />
<strong>PDGS</strong> hardware is upgraded<br />
to support S2B while <strong>PDGS</strong> is<br />
in full operations for S2A<br />
<strong>PDGS</strong> is qualified for<br />
Qualified<br />
operating on the constellation<br />
OSV non-regression and S2B<br />
specific SVTs are performed<br />
<strong>Sentinel</strong>-2 ground-segment is<br />
validated<br />
validated for pre-operations<br />
ground-segment configuration<br />
preoperational<br />
is frozen until S2B launch<br />
S2B commissioning is<br />
performed<br />
<strong>Sentinel</strong>-2 Mission enters full<br />
Operational<br />
routine phase<br />
Table 4-9 <strong>Sentinel</strong>-2 Spacecraft Units Phase-In Scenario within the <strong>PDGS</strong><br />
It shows in particular:<br />
○ A RP configuration accurately following the deployed <strong>PDGS</strong> configuration<br />
systematically reference-qualified for the constellation;<br />
○ A pre-launch version of the <strong>PDGS</strong> already (pre-)qualified for the constellation following<br />
initial <strong>PDGS</strong> IV&V activities;<br />
<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />
© <strong>ESA</strong><br />
The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />
communicated to any third party without written permission from <strong>ESA</strong>.