29.11.2014 Views

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

o Generation of the Downlink-Plan associated to the Image-Acquisition-Plan<br />

‣ Memory playback of MSI data<br />

‣ Memory playback of satellite ancillary data<br />

‣ Memory playback of satellite HKTM data<br />

‣ X-band downlink synchronised wrt. playback activities<br />

‣ OCP downlink synchronised wrt. playback activities<br />

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 296 of 350<br />

o Notify in advance to every ground station the list of required downlink passes<br />

according to the Mission-Plan<br />

o Generation of the ground stations Acquisition-Schedule-Plan<br />

o Generation of the EDRS Booking-Plan<br />

All planning activities will be referenced in OPS mode. Very specific activities might make use<br />

of the MTL scheduling mechanism.<br />

6.15.1.3 Multi-spacecraft Management<br />

Load balancing between the constellation spacecrafts will be implemented at mission<br />

planning level. This will be performed at various levels:<br />

○ In the MSI Image-Acquisition-Plan such that the relative planning of the two satellites<br />

can slightly diverge to accommodate special acquisitions;<br />

○ Downlink-Plan generation according to different ground resources assigned (i.e.<br />

possibility to downlink the data to different ground-stations);<br />

○ In the mission data recovery plan such that different zone coverage priorities impacting<br />

timeliness can be managed independently.<br />

6.15.1.4 SPF-PIF Protocol<br />

The <strong>PDGS</strong> together with the FOS will implement the mission planning loop (cf. section<br />

4.3.7.1).<br />

The exchange of planning information between <strong>PDGS</strong> and FOS will follow the SPF-PIF<br />

protocol.<br />

The Skeleton Plan File (SPF) is generated by the <strong>PDGS</strong> and delivered to the FOS. The SPF<br />

mainly contains requests to schedule an instrument task or command sequences according<br />

to the mission database. <strong>Sentinel</strong>-2 mission supports MTL and OPS requests.<br />

In response to the <strong>PDGS</strong> provided SPF, the FOS generates the Plan Increment File (PIF)<br />

when checking and verifying <strong>PDGS</strong> requests suitability.<br />

6.15.2 OPERATION CONSTRAINTS<br />

The following operation constraints have been identified:<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!