29.11.2014 Views

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 226 of 350<br />

○ Output interface for Mission-Plan file(s) delivery to the FOS (MSI Image-Acquisition-<br />

Plan, Downlink-Plan) through to the MCC function;<br />

○ Output interface to the ground-stations for delivery of the pass-list for the booking of<br />

the required downlink passes and the provision of the Acquisition-Schedule-Plan to<br />

specify the required data-reception and front-end processing activities; done through<br />

the MCC function via the DC function;<br />

5.2.4.3 Mission Performance Assessment (MPA) Function<br />

5.2.4.3.1 Function Objectives<br />

As introduced in Section 4.5.3.2, the MPA function objective is to monitor if mission<br />

requirements are being fulfilled by the <strong>PDGS</strong> and to trigger corrective actions in case of<br />

anomaly. MPA covers the following four sub-functions:<br />

o Off-line Quality Control<br />

o Calibration and Validation<br />

o Instrument Data and Quality Control Processors Verification<br />

o End-to-end System Performance Monitoring<br />

The objective of the Off-line Quality Control is to monitor if the payload and specific on-board<br />

systems (e.g. on-board navigation solution) related products meet the quality requirements<br />

along mission life-time.<br />

The objective of the Calibration and Validation (Cal/Val) is to update on-board and on-ground<br />

configuration data in order to meet product quality requirements.<br />

The objective of the Instrument Data and Quality Control Processors Verification is to verify<br />

the quality of the image processing and quality control processors.<br />

The objective of the End-to-end System Performance Assessment is to detect anomalies at<br />

system-level and provide high-level performance figures on the overall mission performance.<br />

5.2.4.3.2 Design Drivers and Constraints<br />

Due to the operational character of the <strong>Sentinel</strong>-2 <strong>PDGS</strong>, MPA function shall maximize the<br />

automation of recurrent tasks. For not-automatic tasks clear interfaces with human operators<br />

shall be defined.<br />

The MPA Off-line Quality Control shall provide a comprehensible reporting of its findings in<br />

order to minimize anomaly recovery periods.<br />

MPA shall be able to manage a multi-satellite configuration (2A/2B/…).<br />

5.2.4.3.3 Function Interfaces<br />

MPA function has the following interfaces with other <strong>PDGS</strong> functions and external entities:<br />

o The MPA provides to the POM (via DC function) the Off-line Quality Control reports<br />

(daily and N-day cyclic) (including payload and platform status reports), on-demand<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!