Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 267 of 350<br />

6.7.3.4 <strong>Sentinel</strong>-2 Predicted POD Product Supply<br />

This scenario accounts for the autonomous generation of the predicted POD products<br />

according to the POD function configuration. The predicted POD products generation is<br />

schedule-driven for a generation at every orbit.<br />

The following steps are identified for this operation scenario:<br />

1) The POD function in a schedule driven basis (i.e. every orbit) generates autonomously<br />

a predicted orbit product covering the next orbit plus [TBD] orbits according to the<br />

accuracy needs;<br />

2) Based on the configuration rules, the POD will autonomously select and make use of<br />

required L0 ancillary products and related input files;<br />

3) The generated POD file is autonomously delivered to the AI function for later use by<br />

the IDP function.<br />

The use case of the presented operation scenario is the generation of MSI science products<br />

within the 3 hours timeliness constraint in case of contingency with the on-board navigation<br />

solution by usage of the predicted POD products.<br />

6.7.3.5 Monitoring of the On-Board Navigation Accuracy<br />

This scenario accounts for the both autonomous and operator-driven activities performed for<br />

the monitoring of the satellite on-board navigation solution accuracy. The expert-team will<br />

perform different monitoring activities including the assessment of the POD products.<br />

The following steps are identified for this operation scenario:<br />

1) Expert-team triggered activities for the assessment of the on-board navigation<br />

accuracy;<br />

2) Autonomous checks on the Satellite ancillary data (e.g. monitoring for potential gaps);<br />

3) Autonomous checks on the POD products (predicted and restituted products);<br />

4) Autonomous and on-demand reports generation containing the analysis results;<br />

5) Autonomous reports supply to the MPA function for later delivery to the POM.<br />

This scenario will allow assessing the on-board navigation solution accuracy with respect to<br />

the needs on-ground for the MSI processing activities. In addition, the POD products<br />

adequateness is assessed.<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!