29.11.2014 Views

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

GSC Sentinel-2 PDGS OCD - Emits - ESA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>GSC</strong> <strong>Sentinel</strong>-2 <strong>PDGS</strong> <strong>OCD</strong><br />

Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 263 of 350<br />

3) The files are autonomously copied into the media volumes. The operator is alerted for<br />

media volume replacement when current one is filled-up and a new empty one is<br />

required;<br />

4) The media volumes are sent to the destination data circulation function by mail courier;<br />

5) Operator connects / inserts received media volumes that activate the circulation<br />

actions. Then files are retrieved from media volumes;<br />

6) The retrieved files are placed in target interface exchange in-trays according to the<br />

configured data circulation rules.<br />

Some use cases are presented according to this operation scenario when no data availability<br />

timeliness constraints are declared:<br />

○ CGS light configuration with poor data repatriation capabilities may rely on the media<br />

circulation for the level-0 data supply to the PACs;<br />

○ Archive-to-Archive data circulation via media to fill-up a collaborative centre.<br />

6.6 Auxiliary Data Supply (ADS) Operations<br />

6.6.1 PRINCIPLES<br />

The ADS function responsibility is to provision the required auxiliary data to the <strong>PDGS</strong> for the<br />

products generation activities.<br />

6.6.2 OPERATION CONSTRAINTS<br />

As having a dependency on the different processing activities performed at the <strong>PDGS</strong>.<br />

Accordingly it inherits the applicable global production timeliness constraints with respect to<br />

every processing activity performed and shall therefore autonomously operate in advance.<br />

6.6.3 OPERATION SCENARIOS<br />

6.6.3.1 Auxiliary Data Supply<br />

This is the only single operation scenario of the ADS function. It accounts for the ADS<br />

function autonomous generation and supply of the <strong>PDGS</strong> required auxiliary data from<br />

external data-sources (e.g. meteorological data for atmospheric correction activities). ADS<br />

function autonomous generates required auxiliary data and together with the DC function<br />

autonomously makes it available to the applicable <strong>PDGS</strong> functions and centres via the MCC<br />

function (managed as Mission Reference Files).<br />

The use case of this operation scenario is the generation and supply of the auxiliary data<br />

available from external sources such as:<br />

○ IERS UT1-UTC time correlation data required for the L1 processing activities;<br />

○ ECMWF meteo data to be embedded in the Level-1 products;<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!