Issue 1 Revision 2 (draft) - 25.07.2010<br />

GMES-GSEG-EOPG-TN-09-0008<br />

page 81 of 350<br />

4.3.7 FOS OPERATION CONSTRAINTS<br />

4.3.7.1 Mission Schedule Uplink and Mission Planning Loop<br />

Whilst the <strong>PDGS</strong> will be responsible for generating the satellite plan including payload and<br />

downlink activities, the FOS will be in-charge of translating it into a spacecraft understandable<br />

schedule and to uplink the derived schedule to the spacecraft in advance of operations using<br />

the S-Band channel operated from the TMTC station in Kiruna (Sweden). As such both <strong>PDGS</strong><br />

and FOS work-flows for mission planning and scheduling will have to be coordinated.<br />

The mission planning operations to be performed by the <strong>PDGS</strong> will be constrained by the<br />

FOS operation concepts themselves cascading from spacecraft capabilities and constraints<br />

regarding scheduling and uplink.<br />

The FOS will support two complementary operation scenarios for schedule uplink:<br />

○ A nominal uplink scenario, activated recurrently every two weeks to increment the onboard<br />

plan with the 15 subsequent days of autonomous on-board operation;<br />

○ An unplanned uplink scenario, to be used for re-planning, activated on-request and<br />

allowing altering the on-board plan in parts or as a whole down to a couple of days<br />

before its execution on-board.<br />

The S-Band uplink opportunities are constrained to be performed during working-days and at<br />

specific Kiruna passes pre-allocated for <strong>Sentinel</strong>-2 as depicted on Figure 4-3. Two uplink<br />

opportunities are pre-booked for each <strong>Sentinel</strong>-2 spacecraft, one nominal pass and one<br />

backup pass to provision for contingency at FOS level.<br />

Figure 4-3 <strong>Sentinel</strong>-2 Schedule Uplink Opportunities via S-Band<br />

<strong>ESA</strong> UNCLASSIFIED – For Official Use<br />

© <strong>ESA</strong><br />

The copyright of this document is the property of <strong>ESA</strong>. It is supplied in confidence and shall not be reproduced, copied or<br />

communicated to any third party without written permission from <strong>ESA</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!