Proceedings <strong>of</strong> the National Conference on<br />

Trends and Advances in Mechanical Engineering,<br />

<strong>YMCA</strong> <strong>University</strong> <strong>of</strong> <strong>Science</strong> & <strong>Technology</strong>, Faridabad, Haryana, Oct <strong>19</strong>-<strong>20</strong>, <strong>20</strong>12<br />

VTM01 is 1526 sec. Due to variation in cycle time <strong>of</strong> both the machines; the component from the VTM 01 machine<br />

gets bottled up in the buffer station due to shorter operation time <strong>of</strong> the VTL machine From the existing line<br />

balancing chart it is clear that there is higher cycle time (918 sec) at second operation VTM 02 compared to customer<br />

takt time <strong>of</strong> 699 sec. To balance the line for customer takt time at VTM 02 machine two operations namely ID<br />

roughing and ID finishing are shifted to Horizontal Machining Centre A81 machine. The cycle time <strong>of</strong> each operation<br />

is given in the Table 1.<br />

From this change the cycle time at VTM 02 is brought down from 918 seconds to 676 seconds, which gets balanced<br />

with customer takt time <strong>of</strong> 699 seconds which is shown in fig 2.<br />

After shifting two operations from VTM 02 to HMC A81 the cycle time at HMC A81 gets increased to 863 seconds<br />

which is more than the takt time <strong>of</strong> 699 seconds.<br />

1000<br />

918<br />

Cycle Time (seconds)<br />

800<br />

600<br />

400<br />

<strong>20</strong>0<br />

7<strong>19</strong><br />

621<br />

475<br />

Takt Time= 699<br />

0<br />

1st 2nd 3rd 4th<br />

Operation<br />

Figure 1 Line Balancing Chart <strong>of</strong> OIB Axle Housing for Existing State<br />

Takt Time= 699<br />

Cycle Time (seconds)<br />

Operation<br />

Figure 2 Modified Line Balancing Chart for OIB Axle Housing<br />

To balance the cycle time <strong>of</strong> HMC A81 machine with takt time four operations namely Dia 80 rough milling, Dia 63<br />

fine milling, Dia 8 drilling and 3/8 turning operations are shifted to HMC A51 machine.<br />

After shifting these four operations to the HMC A51 machine the cycle time <strong>of</strong> machine HMC A81 comes down to<br />

677 seconds which get balanced with customer takt time <strong>of</strong> 699 seconds. With these improvements waiting time for<br />

the material at HMC A51 machine gets reduced. Process inspection is performed at the end <strong>of</strong> machining work and<br />

time taken for process inspection is 60 seconds.<br />