Proceedings <strong>of</strong> the National Conference on<br />

Trends and Advances in Mechanical Engineering,<br />

<strong>YMCA</strong> <strong>University</strong> <strong>of</strong> <strong>Science</strong> & <strong>Technology</strong>, Faridabad, Haryana, Oct <strong>19</strong>-<strong>20</strong>, <strong>20</strong>12<br />

By providing bins near to the place <strong>of</strong> assembly the operator movements reduced from 3 to 4 steps <strong>of</strong> walking<br />

distance to within reach <strong>of</strong> operator hand movement, hence this index number is reduced from A6 to A1.The revised<br />

standard time in Seconds for the sequence <strong>of</strong> index parameter A1 is;<br />

(A) * (0.36 * FRQ/DIV)<br />

(1) * (0.36* 1/1) = 0.36 seconds<br />

The time reduction for this particular activity is (2.16 – 0.36) = 1.8 seconds<br />

MOST was applied to remaining 40 activities <strong>of</strong> RPTAssembly. After evaluating the actual process it was identified<br />

that 10 operations were found to be taking more time than required in RPT Assembly,The new time standards were<br />

established for these activities which are shown inTable 1.<br />

Table 1. Details <strong>of</strong> Operation Time Reduction<br />

Existing<br />

Modified Reductio<br />

Operation Time<br />

Time n in Time<br />

Name (Seconds<br />

(Seconds) (Seconds)<br />

)<br />

Collect the<br />

Hardware<br />

2.16 0.36 1.8<br />

Insert Flat and<br />

Lock washers in 7.92 3.6 4.32<br />

Bolt<br />

Move towards<br />

Tool Box<br />

2.16 0.36 1.8<br />

Insert Socket in<br />

Tool and<br />

graspthe<br />

4.32 1.08 3.24<br />

pneumatic pipe<br />

Disengage the<br />

socket and tool<br />

3.24 0.36 2.88<br />

Movetowards<br />

Storage Rack<br />

2.16 0.36 1.8<br />

Insert Flat and<br />

Lock washers in 7.92 3.6 4.32<br />

Bolt<br />

move towards<br />

Tool Box<br />

2.16 0.36 1.8<br />

Place the Socket 4.32 1.08 3.24<br />

Disengage the<br />

Socket<br />

2.16 1.08 1.08<br />

Total 38.52 12.24 24.1<br />

Collect the Hardware: Move 3 - 4 steps towards storage rack for collect the M12 bolt, M12 lock washer and M12<br />

flat washer.<br />

Insert Flat and Lock washers in Bolt: Place M12 Lock washer and M12 flat washer into the M12 bolt and then<br />

return to place <strong>of</strong> assembly by 3 to 4 steps<br />

Move towards Tool Box: Move 3 to 4 steps towards Tool Box<br />

Insert Socket in Tool and grasp the pneumatic pipe: Put the socket inside the tool and move 1 to 2 steps towards<br />

super structure for grasp the pneumatic pipe<br />

Disengage the socket and tool and move towards tool box: Disengage the socket and tool and move 1 to 2 steps<br />

towards tool box<br />

Move towards Storage Rack: Move 3 - 4 steps towards storage rack to collect the M10 bolt, M10 lock washer and<br />

M10 flat washer<br />

822