Sl<br />

No.<br />

Sequence <strong>of</strong> operation<br />

Table 3 MOST Sheet with New Established Standard Time for Modified Rear Power Train Assembly<br />

GET<br />

Proceedings <strong>of</strong> the National Conference on<br />

Trends and Advances in Mechanical Engineering,<br />

<strong>YMCA</strong> <strong>University</strong> <strong>of</strong> <strong>Science</strong> & <strong>Technology</strong>, Faridabad, Haryana, Oct <strong>19</strong>-<strong>20</strong>, <strong>20</strong>12<br />

PUT<br />

CONTROLL<br />

ED MOVE<br />

A B G A B P M X I<br />

TOOL<br />

ACTION<br />

F/L/C/<br />

S/M/R<br />

/T<br />

RETUR<br />

N<br />

A<br />

T<br />

M<br />

U<br />

freq<br />

men<br />

Established<br />

Standard<br />

Time (EST)<br />

in sec<br />

1 Move 2 to 3 steps towards storage rack and Get the chain hooks and return 6 3 6 15 1 1 5.4<br />

2 place one end <strong>of</strong> chain hook to the hoist 1 6 1 8 1 1 2.88<br />

3 Place and align other end chain hooks to Seat on the power train 1 3 3 1 8 2 1 5.76<br />

4 Grasp the toggle switch within reach and push the button to lift the power train 1 1 10 12 1 1 4.32<br />

5<br />

Get power train within reach and move power train about 2 to 3 steps with<br />

resistance towards decking fixture and align on it<br />

1 3 3 1 8 1 1 2.88<br />

6<br />

Grasp the toggle switch within reach and push the button to down the power train<br />

on decking fixture<br />

1 1 10 12 1 1 4.32<br />

7<br />

Move decking fixture about 3 to 4 steps towards chassis rear side with high control<br />

along the guide path<br />

1 1 10 3 15 1 1 5.4<br />

8 Press the wheel lock in decking fixture 1 1 1 3 2 1 2.16<br />

9 Press 2 Up switch in decking fixture to lift the power train to the required height 1 1 1 3 2 1 2.16<br />

10 Get the trailing arm within 2 steps and align by putting into the chassis bracket 3 3 1 3 3 13 1 1 4.68<br />

11<br />

Move hand within reach towards Bin to collect the M12 bolt, M12 lock and M12<br />

flat washer<br />

1 1 1 1 0.36<br />

12 Grasp M12 bolt, M12 lock washer, M12 flat washer, M12 nut 1 3 1 5 2 1 3.6<br />

13 place M12 Lock washer and M12 flat washer into the M12 bolt and 1 3 1 5 2 1 3.6<br />

14<br />

Loose fit the bolt into the coupling hole <strong>of</strong> chassis bracket and trailing arm by wrist<br />

action<br />

1 3 6 10 2 1 7.2<br />

15<br />

Place the M12 nut into bolt and loose fit into bolt end (loose tight by 3 rev <strong>of</strong> wrist<br />

action)<br />

1 3 6 10 2 1 7.2<br />

16 move hand towards Tool Box within reach for get tool and socket 1 1 1 1 0.36<br />

17<br />

Get the Pneumatic Tool - LTV38 R70-13 with Socket - <strong>19</strong>x3/8" deep socket and<br />

spanner from the tool table<br />

1 3 1 5 3 1 5.4<br />

18 move 1 to 2 steps towards super structure for grasp the pneumatic pipe 3 3 1 1 1.08<br />

<strong>19</strong> Grasp the Pneumatic pipe from super structure and return to assembly area 3 1 6 10 1 1 3.6<br />

<strong>20</strong> Place pneumatic pipe to tool with socket (push with light pressure) 1 3 1 5 1 1 1.8<br />

825