Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
IDPF108<br />
IDPF109<br />
IDPF110<br />
IDPF111<br />
IDPF112<br />
IDPF113<br />
IDPF114<br />
IDPF115<br />
IDPF116<br />
IDPF117<br />
IDPF118<br />
IDPF119<br />
IDPF120<br />
IDPF121<br />
Risk Assessment<br />
Replacement of splash pool with water<br />
park at <strong>Runnymede</strong> Pleasure Grounds £230,000 RBC<br />
Addition of play equipment for children<br />
with disabilities at <strong>Runnymede</strong> Pleasure<br />
Grounds<br />
£15,000 RBC<br />
Expansion of indoor café at <strong>Runnymede</strong><br />
Pleasure Grounds £24,000 RBC<br />
Replacement of fencing around<br />
entrance, play area and rides area at<br />
<strong>Runnymede</strong> Pleasure Grounds<br />
£25,000 RBC<br />
Improvements/extension to skate park<br />
at Aviator Park £130,000 RBC<br />
Provision of new youth equipment and<br />
landscaping at Bishops Way recreation<br />
ground<br />
Replacement of equipment and<br />
provision of a new enlarged play space<br />
at Walton Leigh rec<br />
£85,000 RBC<br />
£110,000 RBC<br />
Provision of children’s play space at<br />
Thorpe Lea open space £80,000 RBC<br />
Provision of fencing and planting to<br />
screen boundary with football club at<br />
Charta Road rec<br />
£35,000 RBC<br />
Improvements to Charta Road rec<br />
including provision of a BMX track £180,000 RBC<br />
Improvements to Pooley Green Rec to<br />
include MUGA, play area, refurb and<br />
landscaping<br />
£320,000 RBC<br />
Local repairs to tarmac paths (including<br />
bridges) at Gogmore Park Farm £19,500 RBC<br />
Provision of trim trail/fitness equipment<br />
at Gogmore Park Farm £15,000 RBC<br />
Complete resurfacing of all paths at<br />
Gogmore Park Farm £150,000<br />
TOTAL COST<br />
Up to<br />
£3,009,500<br />
11.20 The biggest risks to this type of infrastructure relate to total loss or reduction in quality.<br />
This would have a knock on effect for the general public and their ability to access<br />
outdoor sports facilities in the <strong>Borough</strong>. Given the relatively low number of sites in the<br />
<strong>Borough</strong> which are classified as sites for outdoor sports and recreation, it is considered<br />
that their total loss is unlikely. The reduction in the quality of individual sites is possible.<br />
Improvements are likely to depend on the availability of funding.<br />
RBC<br />
Risk ID Description Probability Severity<br />
IDPR034 Total loss Low Low<br />
IDPR035 Reduction in quality High High<br />
Page | 118<br />
<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>