5.18 As noted in the Local <strong>Plan</strong> section above, it is estimated that an additional 223 EY<br />

places will be generated by the additional residential units which are estimated to come<br />

forward between <strong>2013</strong> and 2025 (just one year short of the end of the plan period).<br />

5.19 It remains Surrey County <strong>Council</strong>’s policy however that the majority of any new<br />

provision will be delivered through the private sectors, with the County <strong>Council</strong> offering<br />

business advice, providing businesses with evidence of need, and offering training and<br />

start up support, as required. SCC has advised however that where additional EY<br />

places are required in an area, the SCC Early Years Service will identify a suitable<br />

location for this infrastructure and invite bids from prospective providers to run these<br />

new settings.<br />

Costs and funding sources<br />

5.20 The only known planned additional facility is at the former DERA site. In the application<br />

which was previously granted for the redevelopment of the site (RU.05/0538), this<br />

facility was to be initially funded by the developer. The total cost of providing the facility<br />

was not specified. It is anticipated that a private pre school facility will be provided as<br />

part of any future development at the site.<br />

5.21 The cost of providing additional infrastructure for EY settings can be derived from the<br />

historic costs in Surrey of doing so. An EY setting is not as complex as a school, and<br />

so the cost of provision of a place for one child at an EY setting is less than the<br />

proportionate cost of a primary school place. The cost of provision of an EY place in Q3<br />

2011 was estimated to be £10,019.<br />

5.22 Developer contributions for EY provision over the period <strong>2013</strong>-2025 is therefore<br />

estimated in the following way: 223 x £10,019 = £2,234,237.<br />

Funding<br />

ID<br />

IDPF001<br />

Risk Assessment<br />

Description<br />

Pre school facility at the former<br />

DERA site<br />

Estimated<br />

Cost<br />

Unknown<br />

Key<br />

Provider(s)<br />

Developer<br />

5.23 The main risk in this case is a rapid increase in demand for places that exceeds<br />

affordable supply for pre school provision and/or a considerable underestimation of the<br />

projected population. This could result in parents being forced to seek childcare<br />

provision outside the <strong>Borough</strong>, or having to stay at home to care for their children<br />

themselves. This would have a cumulative knock on effect for the local economy.<br />

5.24 The probability is considered to be low as the birth rates of the <strong>Borough</strong> are increasing<br />

at a relatively constant rate thus giving providers some certainty as to the provision that<br />

will be required to meet demand. The severity is also considered to be low, as the<br />

effect would be localised to a particular student cohort. However, improving the<br />

population projections and increasing monitoring will assist in the management of these<br />

risks.<br />

Conclusion<br />

Risk ID Description Probability Severity<br />

IDPR001<br />

Unaccounted rapid increase in demand<br />

for places<br />

5.25 Overall there is a projected requirement for 223 additional places over the plan period.<br />

Given that pre school childcare facilities are provided by the market, it is considered<br />

that this will assist in mitigating against the increased number of EY children up to<br />

2026. As noted, it is likely that a private nursery will be provided at the former DERA<br />

site where the largest concentration of new housing will come forward over the plan<br />

Low<br />

Low<br />

Page | 32<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>