- Page 1 and 2: IDP Infrastructure Delivery Plan Fe
- Page 3 and 4: Executive Summary 1 The Infrastruct
- Page 5 and 6: 13 With regard to Higher Education,
- Page 7 and 8: 25 Despite the forecasts for housin
- Page 9 and 10: the Borough’s SANGS over the plan
- Page 11 and 12: Kent, Surrey and Sussex. There is o
- Page 13 and 14: provision will occur over the plan
- Page 15 and 16: CONTENTS CHAPTER 1. INTRODUCTION ..
- Page 17 and 18: Costs and funding sources .........
- Page 19 and 20: Conclusion ........................
- Page 21 and 22: Local Plan ........................
- Page 23 and 24: Chapter 1. Introduction What is the
- Page 25 and 26: o Conclusion. 1.12 The report is su
- Page 27 and 28: LPAs should work collaboratively wi
- Page 29 and 30: Runnymede Borough Councils Sustaina
- Page 31 and 32: Figure 2-Total CO2 emissions for Ru
- Page 33 and 34: Groups and Partnerships Local Econo
- Page 35 and 36: Services (RAVS), which is the coord
- Page 37 and 38: Assessment” (CCRA) is intended to
- Page 39: Table 4 - Location of Potential Res
- Page 43 and 44: 5.18 As noted in the Local Plan sec
- Page 45 and 46: Figure 7- Primary, Junior and Infan
- Page 47 and 48: eception places’ column refers to
- Page 49 and 50: IDPF008 One additional 1fe infant e
- Page 51 and 52: Figure 9-location of secondary educ
- Page 53 and 54: 5.62 SCC is planning on the basis t
- Page 55 and 56: 5.77 Students within Runnymede can
- Page 57 and 58: Local Plan community learning (ACL)
- Page 59 and 60: Chapter 6. Transport Introduction 6
- Page 61 and 62: Figure 11 - Runnymede's Strategic R
- Page 63 and 64: Risk Assessment 6.13 The production
- Page 65 and 66: Table 7 - Cars and vans in Runnymed
- Page 67 and 68: Figure 14- SHMA Population Age Proj
- Page 69 and 70: • Englefield Green and Egham-cont
- Page 71 and 72: IDPF022 IDPF023 IDPF024 IDPF025 Roa
- Page 73 and 74: 6.54 All of the stations in the Bor
- Page 75 and 76: 6.64 Across Surrey, it is expected
- Page 77 and 78: Borough is presented in Table 16 be
- Page 79 and 80: 6.89 In addition, the Egham Sustain
- Page 81 and 82: Table 11 - Five Dimensions of Trave
- Page 83 and 84: 6.114 Surrey CC advise that a benef
- Page 85 and 86: IDPF049 IDPF050 IDPF051 IDPF052 IDP
- Page 87 and 88: 6.127 As aforementioned earlier in
- Page 89 and 90: Chapter 7. Health Introduction 7.1
- Page 91 and 92:
above average patient targets (both
- Page 93 and 94:
Future provision 7.28 The cumulativ
- Page 95 and 96:
Table 13 - % Population aged 65 and
- Page 97 and 98:
Local Plan the Council and County t
- Page 99 and 100:
Costs and funding sources 7.55 The
- Page 101 and 102:
Chapter 8. Utilities Introduction 8
- Page 103 and 104:
Local Plan 8.17 The location polici
- Page 105 and 106:
Risk Assessment 8.30 The main risks
- Page 107 and 108:
Chapter 9. Waste Management Introdu
- Page 109 and 110:
in very special circumstances. It s
- Page 111 and 112:
Chapter 10. Green Infrastructure In
- Page 113 and 114:
Figure 19- National and County desi
- Page 115 and 116:
predominantly lowland heath land an
- Page 117 and 118:
• Hare Hill open space: divides t
- Page 119 and 120:
Costs and funding sources 10.38 The
- Page 121 and 122:
Figure 20 -natural and semi urban g
- Page 123 and 124:
Costs and funding sources 10.54 The
- Page 125 and 126:
Chapter 11. Leisure Facilities Intr
- Page 127 and 128:
Other • Refurbishment/replacement
- Page 129 and 130:
IDPF108 IDPF109 IDPF110 IDPF111 IDP
- Page 131 and 132:
11.28 It is considered unlikely tha
- Page 133 and 134:
Chapter 12. Culture and Heritage In
- Page 135 and 136:
Figure 22- (map 2 of 2) historic an
- Page 137 and 138:
12.16 The Surrey Arts Partnership i
- Page 139 and 140:
Chapter 13. Emergency Services Intr
- Page 141 and 142:
expected in the Borough up to 2026.
- Page 143 and 144:
Funding ID IDPF127 IDPF128 IDPF129
- Page 145 and 146:
percentage of the population receiv
- Page 147 and 148:
13.37 Chertsey Ambulance Station ha
- Page 149 and 150:
Flooding and Flood Defences Existin
- Page 151 and 152:
of works within the context of a 10
- Page 153 and 154:
Chapter 14. Community Services and
- Page 155 and 156:
with sufficient public transport pr
- Page 157 and 158:
14.21 The Bourne Car Park in Virgin
- Page 159 and 160:
14.35 Changes in the nature of libr
- Page 161 and 162:
• Increased IT costs, in infrastr
- Page 163 and 164:
14.63 RBC has been responding to th
- Page 165 and 166:
14.77 Community Transport: Runnymed
- Page 167 and 168:
• reduced budgets internally with
- Page 169 and 170:
following centres and as part of th
- Page 171 and 172:
14.114 Recently, two churches (Chur
- Page 173 and 174:
14.126 Whilst cremation is an alter
- Page 175 and 176:
Chapter 15. Delivery Governance Arr
- Page 177 and 178:
consultation at each stage of produ
- Page 179 and 180:
16.6 The table below outlines the t
- Page 181 and 182:
Type of infrastructure Component Sc
- Page 183 and 184:
Type of infrastructure Component Sc
- Page 185 and 186:
Type of infrastructure Component Sc
- Page 187 and 188:
Type of infrastructure Component Sc
- Page 189 and 190:
Type of infrastructure Component Sc
- Page 191 and 192:
Type of infrastructure Component Sc
- Page 193 and 194:
Type of infrastructure Component Sc
- Page 195 and 196:
Type of infrastructure Component Sc
- Page 197 and 198:
Type of infrastructure Component Sc
- Page 199 and 200:
Type of infrastructure Component Sc
- Page 201 and 202:
Type of infrastructure Component Sc
- Page 203 and 204:
Type of infrastructure Component Sc
- Page 205 and 206:
Type of infrastructure Component Sc
- Page 207 and 208:
Type of infrastructure Component Sc
- Page 209 and 210:
Type of infrastructure Component Sc
- Page 211 and 212:
Left Intentionally Blank
- Page 213 and 214:
Term EY FE (either 1, 2 or 3) GiA G
- Page 215 and 216:
Term SOIS SPA SRN SSSI SWML SWT TAS
- Page 217 and 218:
TERM Planning Policy Statement PPPs
- Page 219 and 220:
Ottershaw Chase 2012/13 Make a feat
- Page 221 and 222:
Hare Hill 2013 -2017 2013/14 Homewo
- Page 223 and 224:
Planned Maintenance 2014-2017 (plea
- Page 225:
All enquiries about this paper shou