• Windsor Street into Gogmore Lane, Chertsey-provision of a cycle gap (both<br />

directions) (timescales unknown)<br />

• Alwyns Lane, Chertsey- allow contraflow cycling (timescales unknown)<br />

• Rowtown junction- cycleway improvements by 2015<br />

• Introduction of controlled pedestrian facilities at A30 London<br />

Road/Christchurch Road, Virginia Water (timescales unknown)<br />

Costs and funding sources<br />

6.116 The estimated costs and key providers of all of the identified projects are outlined in the<br />

table below:<br />

Funding<br />

ID<br />

IDPF031<br />

IDPF034<br />

IDPF035<br />

IDPF036<br />

IDPF037<br />

IDPF038<br />

IDPF039<br />

IDPF040<br />

IDPF041<br />

IDPF042<br />

IDPF043<br />

IDPF044<br />

IDPF045<br />

IDPF046<br />

IDPF047<br />

IDPF048<br />

Description<br />

Egham Sustainable Transport<br />

Package<br />

Wapshott Road/ Bowes Road/ St<br />

Pauls/, Hythe, pedestrian and<br />

cyclists improvements<br />

Langton Way to Crouch Oakpedestrian<br />

and cyclists<br />

improvements<br />

A30 London Road/ St Judes Roadprovision<br />

of controlled pedestrian<br />

facilities<br />

Installation of pedestrian crossing at<br />

Scotland Bridge Road, Addlestone<br />

Simplemarsh Road/High Street,<br />

Addlestone-pedestrian improvements<br />

Green Lane, Addlestone-proposed<br />

pedestrian crossing<br />

Proposed pedestrian refuge on A318<br />

Chertsey Road/ Green Road,<br />

Addlestone<br />

Advanced stop lanes on Brighton<br />

Road/Crockford Park Road,<br />

Addlestone<br />

Advanced stop lanes on Brighton<br />

Road, Addlestone<br />

Proposed cycle track-Green<br />

Lane/High Street to Crouch Oak<br />

Lane, Addlestone<br />

Holloway Hill, Chertsey-footway<br />

improvements<br />

Installation of a pedestrian crossing<br />

at Guildford Street, Chertsey<br />

Bridge Road/Weir Road junction,<br />

Chertsey-capacity and pedestrian<br />

improvements<br />

Eastworth Road, Guildford Street,<br />

Pycroft Road, Chertsey-cyclist right<br />

hand turn lane<br />

Abbots Way, Pycroft, Guildford<br />

Street, Chertsey-advanced stop<br />

lanes<br />

Estimated<br />

Cost<br />

Already<br />

noted in<br />

buses<br />

chapter<br />

Key<br />

Provider(s)<br />

SCC/ RBC<br />

£125,000 SCC<br />

£62,000 SCC<br />

£120,000 SCC<br />

£130,000 SCC<br />

£20,000 SCC<br />

£60,000 SCC<br />

£40,000 SCC<br />

Unknown<br />

Unknown<br />

Unknown<br />

SCC<br />

SCC<br />

SCC<br />

£137,000 SCC<br />

£50,000 SCC<br />

£130,000 SCC<br />

Unknown<br />

Unknown<br />

SCC<br />

SCC<br />

Page | 73<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>