Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• Windsor Street into Gogmore Lane, Chertsey-provision of a cycle gap (both<br />
directions) (timescales unknown)<br />
• Alwyns Lane, Chertsey- allow contraflow cycling (timescales unknown)<br />
• Rowtown junction- cycleway improvements by 2015<br />
• Introduction of controlled pedestrian facilities at A30 London<br />
Road/Christchurch Road, Virginia Water (timescales unknown)<br />
Costs and funding sources<br />
6.116 The estimated costs and key providers of all of the identified projects are outlined in the<br />
table below:<br />
Funding<br />
ID<br />
IDPF031<br />
IDPF034<br />
IDPF035<br />
IDPF036<br />
IDPF037<br />
IDPF038<br />
IDPF039<br />
IDPF040<br />
IDPF041<br />
IDPF042<br />
IDPF043<br />
IDPF044<br />
IDPF045<br />
IDPF046<br />
IDPF047<br />
IDPF048<br />
Description<br />
Egham Sustainable Transport<br />
Package<br />
Wapshott Road/ Bowes Road/ St<br />
Pauls/, Hythe, pedestrian and<br />
cyclists improvements<br />
Langton Way to Crouch Oakpedestrian<br />
and cyclists<br />
improvements<br />
A30 London Road/ St Judes Roadprovision<br />
of controlled pedestrian<br />
facilities<br />
Installation of pedestrian crossing at<br />
Scotland Bridge Road, Addlestone<br />
Simplemarsh Road/High Street,<br />
Addlestone-pedestrian improvements<br />
Green Lane, Addlestone-proposed<br />
pedestrian crossing<br />
Proposed pedestrian refuge on A318<br />
Chertsey Road/ Green Road,<br />
Addlestone<br />
Advanced stop lanes on Brighton<br />
Road/Crockford Park Road,<br />
Addlestone<br />
Advanced stop lanes on Brighton<br />
Road, Addlestone<br />
Proposed cycle track-Green<br />
Lane/High Street to Crouch Oak<br />
Lane, Addlestone<br />
Holloway Hill, Chertsey-footway<br />
improvements<br />
Installation of a pedestrian crossing<br />
at Guildford Street, Chertsey<br />
Bridge Road/Weir Road junction,<br />
Chertsey-capacity and pedestrian<br />
improvements<br />
Eastworth Road, Guildford Street,<br />
Pycroft Road, Chertsey-cyclist right<br />
hand turn lane<br />
Abbots Way, Pycroft, Guildford<br />
Street, Chertsey-advanced stop<br />
lanes<br />
Estimated<br />
Cost<br />
Already<br />
noted in<br />
buses<br />
chapter<br />
Key<br />
Provider(s)<br />
SCC/ RBC<br />
£125,000 SCC<br />
£62,000 SCC<br />
£120,000 SCC<br />
£130,000 SCC<br />
£20,000 SCC<br />
£60,000 SCC<br />
£40,000 SCC<br />
Unknown<br />
Unknown<br />
Unknown<br />
SCC<br />
SCC<br />
SCC<br />
£137,000 SCC<br />
£50,000 SCC<br />
£130,000 SCC<br />
Unknown<br />
Unknown<br />
SCC<br />
SCC<br />
Page | 73<br />
<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>