13.01.2015 Views

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Conclusion<br />

11.35 It is considered that at the current time there is a range of indoor sports facilities<br />

provided within the <strong>Borough</strong>. Whilst some of the existing facilities may need to be<br />

upgraded over the plan period, the only known additional facility proposed to come<br />

forward over the plan period is at the former DERA site (this is excluding the<br />

refurbishment/re-provision of the Egham Leisure Centre). Any other proposals which<br />

come forward for indoor leisure facilities over the plan period will be considered on a<br />

case by case basis.<br />

Page | 121<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!