13.01.2015 Views

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

Infrastructure Delivery Plan (Feb 2013) - Runnymede Borough Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 14. Community Services and Facilities<br />

Introduction<br />

14.1 This chapter details the community services and facilities in the <strong>Borough</strong>, specifically<br />

exploring the <strong>Borough</strong>’s:<br />

• shopping facilities<br />

• libraries<br />

• services for older people (voluntary services)<br />

• youth centres<br />

• places of worship<br />

• cemeteries and crematoriums<br />

14.2 In each sub chapter, the existing provision will be looked at, as well as the expected<br />

future provision over the plan period. Where new infrastructure is forecasted over the<br />

plan period, the provider and sources of funding will be stated (where known).<br />

Shopping Facilities<br />

Existing conditions<br />

14.3 There are shopping centres in Addlestone, Chertsey, Egham and Virginia Water and<br />

other shopping parades and more isolated shops at various locations in the <strong>Borough</strong>.<br />

14.4 The <strong>Runnymede</strong> Retail Study (2009) was the last retail study that was carried out in the<br />

<strong>Borough</strong>. As part of the study, household survey data was used to establish the<br />

existing pattern of shopping behaviour for both food and non-food goods amongst<br />

<strong>Runnymede</strong> residents. This information was also used to assist in identifying the extent<br />

of the catchment of each of the four main centres, and of specific stores (particularly<br />

supermarkets) in the <strong>Borough</strong>.<br />

14.5 The <strong>Runnymede</strong> Retail Study (2009) also assessed the current vitality and viability of<br />

the main centres in the <strong>Borough</strong>, using the indicators of vitality and viability outlined in<br />

PPS6 “<strong>Plan</strong>ning for Town Centres” (please note that PPS6 has now been replaced by<br />

the NPPF). The following conclusions were drawn:<br />

Addlestone:<br />

• Was noted to be a small town which is a service and convenience goods<br />

centre. Dominated by a large number of service units and large amount of<br />

convenience goods floorspace. The Tesco Extra superstore was considered<br />

the main draw to the centre and which supports the towns’ vitality by creating<br />

general shopper presence from which other retailers can benefit. It was<br />

concluded however that the rest of the town centre was not (in 2009) fully<br />

benefiting from the presence of this major retailer;<br />

• The comparison goods retail offer in Addlestone was noted to be limited. The<br />

majority of this retail activity was found to be lost to larger retail centres such<br />

as Staines and Woking;<br />

• The local perception of the centre was found to be poor with a limited quality<br />

and quantity of shops. The urban fabric and the town centre environment was<br />

also found to be dated in places and in need of investment. The wide<br />

pavements in the main retailing area were however found to be a positive<br />

attribute, assisting in creating a generally pleasant shopping environment.<br />

Page | 142<br />

<strong>Runnymede</strong> IDP DRAFT – <strong>Feb</strong>ruary <strong>2013</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!